Mob.942213995 VASTUPURTI ASSOCIATES Architectural, lnterior & Civil Consultant Add.Shende Plot , Ramnager Ghandrapur Pin- 442401 (M.S.) Prop :- Kailash V.Dhabekar B.E. ( Civil ) Ref No. Date :- ENGINEER'S CERTIFICATE To Mrs. Snehankit R Moory Parher ANKIT BUILDERS & DEVELOPERS,chandrapur Subject: Cerfficate of Cost Incurred for Development of PARIVARTAN PtAzAsituated on the Plot 79,80,81.82 bearing Diverted survey no. 17 demarcated by itstotnrdaries (latitude and longitude of the end pointr;Eln-J-th" ruortf, 9.00 M WIDE ROAD tg the South LAND OF SUR. NO-27 to the East 6.00 M wlDE ROAD to the West ptOT NO- 78 of Chandiapur Division villagq KHUT=AIA taluka ChandraOur Distrjct Chandrapur plN 442406 admeasuring area g49.G2 I have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Builffi[[C]/Blockls) of the BuildingsTituateil ofr-th-e plot 79.80.81,82bearing 17 of Division Village KHUTALATa|uka CHANDRAPUR District Chandrapur admeasuring 849.62 sq.mts. are a being developed by ffiI,T-'.*t""'iffi (i) AR.PAR|N|TA "t":I"Xrtf.llfit"',","obyowner/promoter:- MESHRAM (Architect,) (ii AAJ ENGTNEERS (Structural Engineer& Consultant) (iii) MR. UMESH TELANG (MEP Consultant) (i") ER: KAILASH DHABEKAR (Quantity Surveyor) 2. We have estimated thd cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project uhder reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.- 210fiX[0fhe estimated Total Cost of project is with reference to the Civil ,MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 1,50,000,00 /- . The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. TheBalancecostofCompletionoftheCivil ,MEPandAlliedworksoftheBuilding(s) ofthesubjectprojecttoobtain Occupation Certificate/tompletion Certificate from MHADA (PIanning Authority) is estimated at Rs G000000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLEA Buil BLOCK. A ir. No Particulars qmounts fotal Estimated cost of the building --------as on date of ts. -2.10.0fi)fi) legistration is lost incurred as on -------- is. -1.50,000.00 /Uork done in Percentage ;o% iasPercentage of the estimatedcost) lalance Cost to be lncurred Rs. 5000000/- Based onEstimated Cost) lost lncurred on Additional /Extra ltems Nil--- \s on not included in the Estimated Cost(Annexure A) Table A Building BLOCK- B&C ir. No rarticulars \mounts I'otal Estimated cost of the building Block B&C as on date of NOT APPLICABLE legistration is lost incurred as on L5/07 /2017 {OT APPLICABLE fforkdone in Percentage NOT APPLICABLE asPercentage of the estimatedcost) lalance Cost to be lncurred !OT APPLICABLE Based onEstimated Cost) lost lncurred on Additional /Extra ltems {OT APPLICABLE \s on not included in the Estimated Cost(Annexure A) Table A Buildi BLOCK ir. No )a rticula rs qmounts L l-otal Estimated cost of the building Block D as on date of NOT APPLICABLE legistration is lost incurred as on15/07/2017 NOT APPLICABLE ilork done in Percentage NOT APPLICABLE 'asPercentage of the estimatedcost) lalance Cost to be lncurred !OT APPLICABLE ,Based onEstimated Cost) lost lncurred on Additional /Extra ltems !OT APPLICABLE qs on not included in the Estimated Cost(Annexure A) TABLEB (to be'prepared for the entire registered phase of the Real Estate Project) lr.No )a rticula rs \mounts Total Estimated cost of the lnternal and External Development Works including amenities and !OT APPLICABLE Facilities in the layout as on late of Registration. lost incurred as on \IOT APPLICABLE ,based on the Estimated cost) ilork done in Percentage NOT APPLICABLE I as Percentageof the estimated cost) lalance Cost to be lncurred !OT APPLICABLE , Based'on Estimated. Cost) lost lncurred on Additional /Extra ltems \OT APPLICABLE \s on not included in :he Estimated Cost(Annexure A) Yours Faithfully Signatur (License No. ... EN-105) , \i"\> " \ ^u7 ,'f-\+>"- Er. KaitrasnV. nnauekar l,l::l1t g:,1r a s1fi F;lilllj