ARCHITECT PARINITA P. MESHRAM JATPURA WARD NO - 6 , SINDIBAN MOHOLLA,CHANDRAPUR Res. - l}7172l277L53 , Mob.- 9860248100 REGISTRATTON NO. - CA l2OO4 /34s27 ARCHITECTS CERTIFICATE Date: 28/07 /2017 To, Mr.Snehankit R. Mooru The Partner, ANKIT BUILDERS & DEVEIOPERS,chandrapur Subject: certificate of Percentage of Comffiion of Construction Work of PARIVARTAN PLAZA No. Of Building(s)/Wing(s) of the Phase of the Project I MAHARERA Registration Number] situated on the Plot bearing C.N. No/CTSNo./SURNO t7 no./FinalPlotno79,80,81,82 demarcated by its boundaries (latitude and longitude of the endpoints)to the North 9.00 M WIDE ROADtotheSouth LAND OF SUR. NO.-27 to the East 5.00 M WIDE ROAD to the West PLOT NO -78 Division villageKHUTALA_Taluka CHANDRAPUR District CHANDRAPUR PIN -!!!!240qadmeasuring 849.52 sq.mts. area being developed by ANKIT BUILDERS & DEVELOPERS Sir l/We have under taken assilnment as Architect/Licensed Surveyor of certifying Percentage of Completion of conrti'r.tion work of the eritain;]rywin€(s) of- ilo Phase of the Project ,situated on the plot bearing C.N. No/CTS No./SURt 17no.l Final Plot no 79,80,81,82 of Division Village KHUTAIA taIukaCHANDRAPUR District CHANDRAPURPIN -1!42406 admeasuring 849.62 sq.mts. area being developed bYANKIT BUILDERS & DEVELOPERS 1. Following technical professionals are appointed by Owner/ Promoter:- i) ARCHTTECT AR. PARINITA P. MESHRAM, CHANDRAPUR (ii) STRUCTURAL ENGINEER - AAJ ENGINEERS (iii) MEp CoNSULTANT - MR. UMESH TELANG (iv) SITE SUPERVISIOR - Mr. ASHISH BAGDE Based on Site lnspection, with respect to each of the Building of the aforesaid Real Estate Project ,l certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number under MAHARERA is as per table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A PARIV Sr. No l-asks /Activity )ercentage ff work done 1 Excavation LOO% rumber of Basement (s)and Plinth Basement-O ,linth(1)-L00% rumber of Podiums 0 itilt Floor 0 I number of Slabs of Super Structure 100 nte rna I wa I ls, I nterna I Plaste r, Floo rings within Flats/Premises, Doors t0 rnd Windows to each of the Flat/Premises ianitary Fittings within the Flat/Premises, Electrical Fittings within l0 :he Flat/Premises itaircases, Lifts Wells and Lobbies at each Floor level connecting itaircase-95% itaircases and Lifts, Overhead and Underground WaterTanks lhe external plumbing and external plaster, elevation, completion of 50% :erraces with water proofing of the Building/Wing, nstallation of waterpum ps,FireFightingFittingsand Eq uipmentasperCFONOC, Ele to Common Areas, electro, mechanical equipment, mpliance to conditions of environment/CRZ NOC, Finishing to ance lobby/s, plinth protection, paving of areas Building/Wing, Compound Wall and all other requirements as y be required to Obtain Occupation /Completion Certificate TABLE-B lnternal & External Development Works in Respect of the entire Resistered phase Percentage of Facilities, Amenities Work done nternal Roads & Footh paths chamber, lines, Septic Tank torm Water Drains ping &Tree Planting ent and disposal id Waste management & ater conservation, Rain wa in water harvesting 11. :nergy Management l l L2, :ire protection and fire safety l l 'equirements r3. :lectrical meter room, sub- l ;tation, receiving station 14. )thers(Option to ) l Add more) Yours Faithfully A ffi9.+l,rr*. Signature& Name of A rchitect ( Lice nse NO... CA,l 2OO4I 34527 |