HD SUIOCIATEI AR.IARIAY BAIAftTAftl ARCHITECT. lftTERIOR DHIGftER &PIAnnER SSB Associates 204, Imperial Plaza, Somwar Bazar Road, Sltabuldl, Nagpur-440012, +91-7507917000 Annexure B FORM2 [see Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from 09/05/2026 Designated Account-Project Wise) Date: To, SUBHASH SHAMLAL MAHULE Nagpur, MAHARASHTRA,440013 Subject: Certificate of Cost Incurred for Development of JAGDAMBA SARASWATI NAGRI -10 having MahaRERA Registration Number P50500081064 (Only Applicable after project Registartion) being developed by SUBHASH SHAMLAL MAHULE Sir, Wle SANJAY S BASANTANI have of Certifying Estimated Cost for JAGDAMBA SARASWATI NAGRI -10 having Maha RE RA Registration Number P50500081064 (Only Applicable after project Registration, being developed by SUBHASHSHAMLALMAHULE) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer/ Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor• appointed by Developer/Engineer, the assumption ofthe cost of material.labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of the aforesaid project under reference at Rs. 20018650.96 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works.as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate/ completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the Nagpur Metropolitan Region Development Authority being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 10693429.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. Page 1 of4 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 9325221.96 (Total ofTable A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works.as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :/ Sr. No. Particulars Amount /In Rs.\ 1 Total Estimated Cost of the Building/Wing/Layout 0 Plotted Develooment as on date of ReQistration is 2 0 Cost incurred as on date of certificate 3 Work done in Percentaae Ias Percentaae of the estimated cost\ 0 4 Balance Cost to be lncurred../Based on Estimated Cost\ 0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Page 2 or4 Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Parti (1) culars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/La yout Plotted Develooment as on date of Reaistratio 20018650.96 n is 2 Cost incurred as on date of certificate 3 Work done in Percentaae las percentaQe of 10693429.00 the estimated cost) 4 Balance Cost to be lncurred..(Based on Estim 53.42 ated Cost) 5 Cost Incur red on the Addit ional /Extr a items 9325221.96 Estimated Cost /Table -Cl not inclu ded in the Yours Faithfully $~ AR. SANJAY S. BASANTANI B.A rch. CA/ 201 1/53 937 SANJAY S BASANTANI NMC /R-6 5£1 , NIT /263 ~' Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. (if applicable) Date of Certificate: Agreed and Accepted by: Signature of Promoter 09/05/2026 Name: SUBHASH SHAMLAL MAHULE Date: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved per specifications mentioned in agreement of from lime to time and as sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independe nt Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer.th e name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost Cost incurred (2) due to deviation in quantity (1) and Actual required / escalation of cost etc. As this is an deviation in quantity required for developme estim ated cost, any nt of the Real Estate Project will result in amen dment of the cost incurred / to be incurred. 4.AII components of work with specifications are indicative and not exhaustive 5.Please specify if there are any devia tions / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLE C List of Extra/AdditionaUDeleted Items consi dered in Cost. (which were not part of the original Estimate of Total Cost) Page4 ol4