ANNEXEURE A FORM 1 (SEE REGULATION3) ARCHITECT’S CERTIFICATE (FOR REGISTRATION OF A PROJECT UNDER MAHA-RERA) Project Name: MB TOWN 4 Date: 2nd April 2025 To, M/s. Maharana and Bose Associates Plot No. 42, MB Town III, Godhani Road, Zingabai Takli, Sparsh Hospital, Nagpur - 440030. Subject: Certificate of percentage of Completion of Construction Work of “MB TOWN 4”, situated on the Plot bearing C.N. No./CTS No./ Survey no./Final Plot No. 16 and 17, CTS No. 37, Kh. No. 35/5; demarcated by its boundaries (latitude and longitude of the end points) Plot No. 18 to the North, Land of Kh No. 37/1 to the South, 9 Mtrs Wide Road and Plot No. 15 to the East, Land of Kh No. 37/2 to the West, of Village (Mouza) – Gorewada, Tah. & Distt. – Nagpur, PIN – 440013, admeasuring 2951.191 sq. mts. area being developed by M/s. Maharana and Bose Associates. Sir, I/We ________Vaibhav Khadse______, have undersigned assignment as Architect/Licensed Surveyor of certifying percentage of completion of construction work of “MB TOWN 4”, situated on the Plot bearing C.N. No./CTS No./ Survey no./Final Plot No. 16 and 17, CTS No. 37, Kh. No. 35/5; demarcated by its boundaries (latitude and longitude of the end points) Plot No. 18 to the North, Land of Kh No. 37/1 to the South, 9 Mtrs Wide Road and Plot No. 15 to the East, Land of Kh No. 37/2 to the West, of Village (Mouza) – Gorewada, Tah. & Distt. – Nagpur, PIN – 440013, admeasuring 2951.191 sq. mts. area being developed by M/s. Maharana and Bose Associates. Based on site inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on date of this certificate, the percentage of work done for each of Building/Wing of the Real Estate Project under MahaRERA Page 1 of 4 is as per TABLE A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in TABLE B. TABLE A MB TOWN 4 Sr. Task / Activity Percentage of Actual No. (2) Work Done (As on date (1) of the Certificate) (3) 1 Excavation 100% 2 Basement (if any) 0% 3 Podium (if any) 100% 4 Plinth 100% 5 Stilt Floor 10% 6 Slab of Super Structure 0% 7 Internal Wall, Internal Plaster, Flooring, Doors 0% & windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 0% 9 Staircase, Lifts Wells and Lobbies at each floor 0% level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster 0% elevation completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 0% fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities Page 2 of 4 TABLE B Common Area (Internal & External Development Works) in respect of MB TOWN 4. Sr. Common Area & Proposed Percentage of Details No. Facilities Yes/No Actual Work (5) (1) (2) (3) Done (As on date of the Certificate) (4) 1 Internal Road & Foot NO N.A. N.A. path 2 Water Supply YES 0% Work-in-progress 3 Sewerage (Chamber YES 0% Work-in-progress Lines, Septic Tanks, STP) 4 Storm Water Drains YES 0% Work-in-progress 5 Landscaping and Tree YES 0% Work-in-progress Planting 6 Street Lighting YES 0% Work-in-progress 7 Community Building NO N.A. N.A. 8 Treatment and Disposal NO N.A. N.A. of sewage and sullage water 9 Solid waste management YES 0% Work-in-progress & disposal 10 Water Conservation/ YES 0% Work-in-progress Rain Water Harvesting 11 Energy Management YES 0% Work-in-progress 12 Fire protection and fire NO N.A. N.A. safety requirements 13 Electrical meter room, YES 0% Work-in-progress sub-station, receiving station 14 Other (Option to Add NA N.A. N.A. More) Page 3 of 4 Yours Faithfully, Signature & Name __________ Vaibhav Khadse _________ OF L.S./ Architect (License No.: _______________________) Agree and Accepted Signature of Promoter Name: M/s. Maharana and Bose Associates Date: 2nd April 2025 Page 4 of 4