Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 16/01/2026 To, BHAVYA INFRAVENTURES PRIVATE LIMITED NAGPUR, MAHARASHTRA, 440013 Subject: Certificate of percentage of Work of completion of construction work of GOVIND RESIDENCY-III having MahaRERA Registration Number P50500080432 (Only Applicable after project Registtion) being developed by BHAVYA INFRAVENTURES PRIVATE LIMITED Sir, I/We EMANATE DESIGN have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of GOVIND RESIDENCY-III having MahaRERA Registration Number P50500080432 (Only Applicable after project Registration, being developed by BHAVYA INFRAVENTURES PRIVATE LIMITED) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Govind Residency-III/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 3 Podiums (if any) 4 Plinth, 70.00 5 Stilt Floor 22.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 2 Water Supply Yes 12.00 CORPORATIO N WATER SHALL BE PROVIDED 3 Sewerage (Chamber, Lines, Septic Tank, STP) Yes 0.00 AS PER SACTIONED PLAN 4 Storm Water Drains Yes 0.00 AS PER SACTIONED PLAN 5 Landscaping & Tree Planting Yes 0.00 AS PER SACTIONED PLAN 6 Street Lighting No 7 Community Buildings No 8 Treatment And Disposal Of Sewage And Sullage Water No 9 Solid Waste Management And Disposal No 10 Water conservation /Rain water harvesting Yes 0.00 AS PER SACTIONED PLAN 11 Energy management No 12 Fire protection and fire safety requirements Yes 0.00 AS PER SACTIONED PLAN 13 Electrical meter room, sub-station, receiving station Yes 0.00 AS PER SACTIONED PLAN 14 Aggregate area of recreational Open Space No 15 Open Parking No Yours Faithfully EMANATE DESIGN Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2007/39381) Date of Certificate: 16/01/2026 Agreed and accepted by: Signature of Promoter Name: BHAVYA INFRAVENTURES PRIVATE LIMITED Date: 16/01/2026 Page 3 of 3