N..8. LJTNDf,, Project Engineer (DCE) Civil Construction Mob No. 5764465443 Layout Development Address :- 59, Kharbi Road, Maa Bhawani Nagar,Wathoda, Building Works Nagpur-440034. Annexure B FORii 2 [see Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) oale:1110412026 To, PPJ PROPERTIES PRIVATE LIMITED Nagpur, triAHARASHTRA,4400'l 5 Subject: Certificate of Cost lncurred for Development of MAULI TOWN-30 having MahaRERA Registration Number P50500080878 (Only Applicable after project Registration) being developed by PPJ PROPERTIES PRIVATE LIMITED for the period of January-2026 to March-2025. Sir, l/vve N B LANOE have of Certifying Estimated Cost for MAULI TOWN-3o having MahaRERA Registration Number P50500080878 (Only Applicable after project Registration, being developed by PPJ PROPERTIES PRIVATE LIMITED) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apa(ments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the proJect underreference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Ouantity Surveyor" appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of the aforesaid project under reference at Rs. 26117800.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of pro.ject is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certiflcate / completion certificate for the Bualding(s) /Wing(s)/ Layout /Plofted Development from the NAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY (NMRDA) being the Planning Authority under whose jurisdiction the aforesaid project is being impiemented. N. B. LJTNDE Project Engineer (DCE) Civil Construction Mob No. 9764465443 Layout Development Address :- 59, Kharbi Road, Maa Bhawani Nagar,Wathoda, Building Works Nagpur-440034. 4.The Estimated Cost incurred till date is calculated at Rs. 8880052.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completiofl of the apartments and proportionate Completion of internal & external works, as per specification mentioned in agreement of sale, of theProject is estimated at Rs.l7237748.00 (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works, as per specificatron mentaoned in agreement of sale, of the aforesaid Pro.ject as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :/ Sr. No. Particu lars Amount (ln Rs.) 1 Total Estimated Cost of the Bu ildingruVing/Layout 0 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 0 3 Work done in Percentage (as Percentage of the estimated cost) 0 4 Balance Cost to be lncurred-*(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) N. B. IJhNDE Project Engineer (DCE) Civil Construction Mob No. 9764465443 Layout Development Address:- 59, Kharbi Road, Maa Bhawani Nagar,Wathoda, Building Works Nagpur-440034. Table B lnternal and Exte.nal Oevelopment Works in respect of the Registered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 261 17800.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 8880052 00 3 Work done in Percentage (as percentage of the estimated cost) 34.00 4 Balance Cost to be lncurred"(Based on Estimated Cost) 17237748.00 5 Cost lncurred on the Addltional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully N B LANDE Signature & Name (lN ELOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. NA (if applicable) Date of Certificate.'l I10412026 Agreed and Accepted by: Signature of Promoter Name; PPJ PROPERTIES PRIVATE LIMITED Dale.1110412026 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from tame to time and as per specifications mentioned in agreement of sale. 2.(-) Ouantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (-) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). .N..8. IJTNDE Project Engineer (DCE) Civil Construction Mob No. 9764465443 Layout Development Address :- 59, Kharbi Road, Maa Bhawani Nagar,Wathoda, Building Works Nagpur-440034. 3.(.') Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1)and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost)