PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGTNEER PLANNERS, BUIU)E.RS AND Df.VELOPERS uc. No. N.t.T. 1969, N.M.C. S80 N.M.R.D.A.-S9 OFF. : - SHOP NO.1 15 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001 . M- 99234329 Annexure A FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Oalet 0210412026 To, PPJ PROPERTIES PRIVATE LIMITED NAGPUR, MAHARASHTRA, ,140015 Subject : Certificate of percentage of Work of completion of construction work of MAULI TOWN-3o having MahaRERA Registration Number P50500080878 (Only Applicable after project Registartion) for the pedod Jan 2026 to tlrarch 2026, situated on the land bearing survey No. 30, P.H No.74lA, Mouza- Bothali, Taluka - Nagpur (Gramin), Distinct - Nagpur,being developed by PPJ PROPERTIES PRIVATE LIMITED, Sir, l/vve AR PAWAN GUPTA have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of MAULI TOWN-3o having MahaRERA Registration Number P50500080878 (Only Applicable after project Registration, being developed by PPJ PROPERTIES PRIVATE LIMITED) Based on Site lnspection,with respect to Layout / each of the BuildingMing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuilding/Wing Number: NA Plot Without Structu,e Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) PAWAN RAVIPRASAD GUPTA CONSULTIIJG CIVIL ENGINEE.R PL.{I,NNERS, BUILDERS AND DEVELOPERS uc. No. N.r.T. 1969, N.M.C. S80 N.M.R.D.A.-SS OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001. M- 99234329 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities ls AYailable Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (21 (3) (4) (s) 1 lntemal Roads & Footpaths Yes 90.00 WORK IN PROGRESS 2 Water Supply Yes 90.00 WORK IN PROGRESS 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 70.00 WORK IN PROGRESS 4 Storm Water Orains Yes 90 00 WORK IN PROGRESS 5 Landscaping & Tree Planting Yes 40.00 WORK IN PROGRESS 6 Street Lighting Yes 50.00 WORK IN PROGRESS 7 Community Buildings No 000 NA I Treatment And Disposal Of Sewage And Sullage Water Yes 20.00 WORK IN PROGRESS 9 Solid Waste Management And Disposal No 000 NA 10 Water conservation /Rain waler harvesting Yes 90.00 WORK IN PROGRESS 11 Energy managemcnt No 0.00 NA 12 Fire protection and Iire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station Yes 000 WORK IN PROGRESS 14 Aggregate area of recrealional Open Space Yes 60.00 WORK IN PROGRESS 15 Open Parking No 000 NA Yours Faithfully S4F AR PAWAN GUPTA Signature & Name (lN BLOCK LETTERS) of L S/ Architect (License No. LlC. NO N I T 1969. N.lvl.C. 380 N.M.R.D A -39) Date of Certificate: Agreed and accepted by: Signatu re Name: PPJ PROPERTIES PRIVATE LIMITED Date: 0210412026