SI D D H AN T C H AV H AN BE(Civil) Mobile No. 7769940242 LICENSE NO. - 006947 Annexure B FORM 2 [see Regulation 3J ENGINEER'S CERTIFICATE for withdrawal of Money from (To be submitted at the time of Registration of Ongoing Project and Designated Account-Project Wise) Date: 11-0 4-20 26 Q-b o-n : '31·03-Z 02.6 To, Ajay Vasudeo Sahni Nagpur, MAHARASHTRA,440004 ration t of HARINAM ESTATE having MahaRERA Regist Subject: Certificate of Cost Incurred for Developmen Vasudeo Sahni t Registartlon} being developed by Ajay Number P50500080438 (Only Applicable after projec Sir, Maha RERA ing Estimated Cost for HARINAM ESTATE having I/We Siddh ant Deepak Chavhan have of Certify by Ajay Vasudeo able after project Registration, being developed Registration Number P50500080438 (Only Applic Sahn i) ents and allied works required for completion of the apartm 2. We have Estimated the cost of Civil, MEP and agreements of the project as per specifications mentioned in proportionate completion of internal & external works the projec t under on the drawings/plans made available to us for of sale. Our estimated cost calculations are bassd work as Schedule of items and quantity required for the entire reference by the Devel oper/ Consulatants. The of mater ial.labour and Developer/Engineer, the assumption ofthe cost calculated by Quantity Surveyor* appointed by above analysis tion carried out by us to ascertain / confirm the other inputs made by developer.and the site inspec given to us. Rs. (Total of Table etion of the aforesaid project under reference at 3. We estimate Total estimated the Cost of compl Civil, MEP and Allied ted Total Cost ofproject is with reference to the A and B) at the time of Registration. The estima al works.as per and proportionate completion of internal & extern works required for completion of the apartments ate I completion and for the purpose of the obtaining occupation certific specifications mentioned in agreements of sale polita n Region t /Plotte d Devel opme nt from the Nagp ur Metro certifi cate for the Buildi ng(s) /Wing (s)/ Layou aid project is being Autho rity under whose jurisid iction the afores Deve lopm ent Autho rity being the Plann ing implemented. nt of Estimated Cost ated at Rs. (Total of Table A and 8).The amou 4.The Estimated Cost incured till date Is calcul ials/services used and unit cost of these items. incurred Is calculated on the basis of Input mater for completion of the apartments and s. The Balance Cost of Completion of the Civil, MEP and Allied works Page 1 of 4 Proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned In agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number·/ I . Sr" No. Partlculara Amount (In Rs.) I 1 Total Estimated Cost of the Building/Wing/Layout 0 Plotted Development as on date of Registration is 2 0 I Cost incurred as on date of certificate 3 Work done in Percentage (as Percentaoe of the estimated cost) 0 4 Balance Cost to be lncurred**{Based on Estimated Cost) 0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Page< Qf Table B Internal and External Development Works In respect of the Registered Phase Sn No~ 'Pattlculart Amount (In Rs.) :1 1 Total Estimated Cost of the Building/Wing/Layout 22247000.00 Plotted Develo ment as on date of Re lstratlon Is 2 Cost incurred as on date of certificate 5710000.00 --- 3 Wor1< done in Percents e of the estlma~te~d~c~o~s:!..lt~--1-------- ---2--'5'--.6 .;;_77 4 Balance Cost to be Inc Estimated Cost 16537000.00 5 Cost Incurred on the Additional/Extra items not Included in the Estimated Cost Table -C Yours Faithfulry /(\) ~ ~~- SIDDHANT DEEPAK CHAVHAN Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. 006947 (if applicable) Date of Certificate: I:f- OG~2 O2.6 Agreed and Accepted by: ) AJAY SA N Signature of Promoter ~ Name: Ajay Vasudeo SahnproprietQ r Date: 31 ·03-202.-&' . 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor.whose certificate of In case of independent quantity surveyor b~ing appointed by Developer, the name has to be mentioned at the place marked(*) and in case quantity are being calculated by office of Engineer.the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3, (**) BaJance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred I to be incurred. 4.AII components of work with specifications are Indicative and not exhaustive 5.Please specify if there are any deviations/ quallficatlons. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4