SIDDHANT CHAVHAN BE(Civil) " Mobite No.776994024) LICENSE NO. - 006947 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Desig nated Account-project Wise) Date: l3.tO'2o25 To, ClA on - ao.o3'LoLs Ajay Vasudeo Sahni Nagpur, MAHARASHTRA,440004 Subject: Certificate of Cost lncurred for Development of HARINAM ESTATE having MahaRERA Registration Number P50500080438 (only Applicable after project Registartion) being $eveloped by Ajay Vasudeo sahni Sir, l/we siddhant Deepak Chavhan have of Certifying Estimated Cost for HARINAM ESTATE having MahaRERA Registration Number P50500080438 (only Applicable after project Registration, being developed by Ajay Vasudeo Sahni ) 2'We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3' We estimate Total estimated the CoEt of completion of thc aforesaid prfiject under reference at Rs. (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc civil, MEp and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the Nagpur Metropolitan Region Development Authority being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4 The Estimated Cost incured till date is calculated at Rs. (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for oompletion of the apartments and Page 1 of4 proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs (Total of Table A and B) 6 I certify that the Cost of the Civil, MEP and allied works the for the apaftments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development Number:/ Sr. No. E I I 1 Total Estimated Cost of the Building/Wing/Layout 0 Plotted Developnent as on date ofReqis--tratiiln is 2 Cost incurred as on date of certificate 0 J Work done in Percentaqe (as Percentage of the estimated cost) 0 4 Balance Costto be lncurred**(Based on Estimated Cost) 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Page 2 of 4 Table B lnternal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 22247000.00 Plotted Development as on date of Reoistration is 2 Cost incurred as on date of certificate 1600000.00 J Work done in Percentaqe (as percentaqe of the estimated cost) 7.19 4 Balance Cost to he lncrrrred**(Basecl on Fsfimated Cost\ 20647000.00 A Cost lncurred on the Additional/Extra items not included in the Estimated Cost fia v t? , SIDDHANT DEEPAK CHAVHAN Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. 006947 (if applicable) Date of Certificate: ) Agreed and Accepte*,! SPr l-i il-':1 Name: Ajay Vasudeo Sahni Proprietor Date: l$.lO.20Zs 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(.) Quantity survey can be done by oflice of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (-) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(*-) Balance Cost to be incurrdd (4) may vary from Difference between Total estimated Cost (1 ) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. ', 4.All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLE C List of Extra/Additional/Deleted ltems considered in Gost. (which were not part of the original Estimate of Total Cost) Page 4 of 4