RAMDAS V WAGH (BE CiviU H. No. 501, Near Sangh Buitding, Mahat Nagpur 8888848959 FORM.2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSUMNCE (Site Supervisofs Certifi cate) (To be submitted at the end of Financial Year) Date:g f,o8.2DZ6 To, The Rajoli lnfra Rrt Ltd Nagpur (M Corp.), Nagpur (Urban), Nagpur, 440012 Qual ity Assurance Gertificate (Certificate No. ......................for the Year Ending ...9"5.:.?0......1 Subiect : Certificate for quality of materials used and quality of Construction and workmanship of the work of RAJOLI GREENS 2 having MahaREM Registration Number P50500080322being developed by Rajoti tnfra Pvt Ltd Sir. rnrue ..fl:.Ytl/).h.H. have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been No conducted before the structural design and soil parameters have been accounted for in the structural desiqn/drawinqs? 2 Whether Structural Engineer has been appointed for No the proiect? 3 Whether the inspection registers, site order book No and quality controltest registers are maintained at the site properly and endorsed by the Engineer-in- Charqe? 4 Whether testing facilities to check quality of material No is available at site? 5 Whether the statuary provisions for disaster No resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? Page 1 of3 Sr. No. Parameters Yes/No Remarks 6 Has suitable cognizance been taken on demarcated No flood lines and appropriate precautions taken for protecting the site from flooding considering local floodinq issues? 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 Whether ihe foliowing building materials confirm to Yes relevant lS/BSiNBC Code, or as per lndustry Standards? lf yes, provide details: (a) Cement, concrete and coarse aqqreqate Yes 53 GRADE (b) Steeland its allovs Yes 5OOFE (c) Electricalwire, fittinqs and accessories Yes ISI MARK (d) Plumbinq and sanitarv fittinqs Yes ISI MARK 2 Whether regular tests of materials and construction Yes STANDARDISED TESTING LABS products are being done from accredited labs also? lf yes, details of such labs 3 Whether manufacturer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are beinq maintained? 4 Whether suitable water is being used for Yes construction? i) What is the source of water? Yes (ii) Has water been tested and approved bv No - Engineer-in-Charqe before construction? (iii) Has water been tested subsequently as per No requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical No wi ri n g/connections/l ift nstal lation/other electrical i installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary No including installation of watei supply iystems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? J Whether allthe work is being carried out under No supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and ttre ivorkis within the acceptable and pennissible Iirnits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to No prevent dampness and leakages? lf yes, provide details 5 Whether safety precautions are underlaken during No construclion activities for all tvpe of workers? Page 2 of3 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? lf ves, provide details. 2 Whether anti-termite treatment has been undertaken No for the soil? 3 Whether fire-fighting arrangements has been No undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on No site/completed buildino as Der reouirement? 5 Whether precautions are undertaken to avoid air No pollution durinq construction? Please soecifv. o Whether records of all test reports/results have been No properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed bver to the association of allottees? 8 Any innovative/cost effective/green tech nology has No leen used for improving quality/energy efficiehcy? Please specifu. .g::-tr ffii" Yours Faithfully .i-\ :11:.:- '/.r- ,,,T\Mm i, Name: Ramdas Wagh 45,-'.'-'-',' ''',, Qualification (Not less than graduate) License No. (if any): 4085 Phone No: Prace: Nfio?un Agreed and accepted by Signature oter Name: 'ra Pvt Ltd Date: a3o ,20 z*lb Page 3 of 3