RAMDAS V WAGH (BE Civit) . H. No. 501, Near Sangh Buitding, Mahat Nagpur 8888848959 ' Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date:-!9.o 6.|LD?S To, Rajolilnfra Pvt Ltd Nagpur, MAHARASHTRA,44001 2 Subject: Certificate of Cost lncurred for Development of RAJOLI GREENS 2 having MahaRERA'Registration Number p50500080322 (Only Applicable after project Registartion) being developed by Rajoli Infra Pvt Ltd Sir, t/We Ramdas Wagh have of Certifying Estimated Cost for RAJOLI GREENS 2 having MahaRERA Registration Number p50500080322 (Only Applicable after project Registration, being developed by Rajoli lnfra Pvt Ltd ) and 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments proportionate completion of internal & external works of the project as per specifications mentioned in agreements for the project under of sale. our estimated cost calculations are baspd on the drawings/plans made available to us reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as material,labour and calculated by euantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. we estimate Total estimated the cost of completion of thc aforesaid project under reference at Rs. (Total of rable Civil, I\'IEP and Allied A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc & external works,as per works required for completion of the apartments and proportionate completion of internal specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) Ming(s)/ Layout /Plotted Development from the HINGNA NAGAR PANcHAYAT being the planning Authority under whose jurisidiction the aforesaid project is being implemented. amount of Estimated cost 4.The Estimated cost incured till date is calculated at Rs. (Total of rable A and B).The incurred is calculated on the basis of input materials/services used and unit cost of these items' of the apartments and 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs (Total of Table A and B) Page 1 of4 I 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as compteted on the date of this certificate is as given in Table A and B beilow: Table-A Building/ Wing /Layout Plotted Number: 1 Total Estimated Cost of the BuildinqMinq/Lavout 0 Plotted Development as on date of-Reois"trati6n is 2 0 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentaqe of the estimated cost) 0 4 Balance Cost to be lncurred**(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost ffable-C) Page2of4 Table B lnternal and External Development Works in respect of the Total Estimated Cost of the as on date of Reqistration is Cost lncurred on the Additional/Extra items not included in the Yours Faithfully 5AD / .,\'$)' Liasentttto 1* .p [JJltFrr J *, \rn ti.10B5r/ RAMDAS WAGH Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. 4085 (if applicabte) Date of Certificate: AgXd and Accepted by: x sig 'of Promoter N6-me: ajoli Infra Pvt Ltd Date: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 ol 4