SANDEEP PANDIT ARCHITECTS architect " interior " landscape design Office -Shop No. -1, Jairam Apartment, SANDEEP PANDIT ARCoNTECTS Near NIT garden, Trimurti Nagar, Nagpur Mob. 9975497212 FORM1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: -05-01-2026 To, M/S SHREE CONSTRUCTION Laxmi Nagar, Nagpur. Subject: Certificate of Percentage of Completion of Construction Work of Residential Project "SHREE MENSION" situated on the Plot No. - EWS, Kh. No. - 107/3-7 &107/4, CTS. NO. - 628 & 629, Sheet No. - 41 (593), PSK NO. - 44, Ward No. - 74, House No. - 989/A/A and B, Mouza - JAITALA, Tah. & Dist. Nagpur. total land admeasuring 2516.28 Sq. Mtr. area Having MAHARERA Registration Number P50500080906 being developed by M/s SHREE CONSTRUCTION Sir. I, Mr. Sandeep R. Pandit have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction work of the Residential Building "SHREE MANSION" situated on the Plot No. - EWS, Kh. No. - 107/3-7 &107/4, CTS. NO. - 628 &629, Sheet No. - 41 (593), PSK NO. - 44, Ward No. - 74, House No. - 989/A/A and B, , Mouza - JAITALA, Tah. &Dist. Nagpur, total land admeasuring 2516.28 Sq.Mtr. area being developed by M/S SHREE CONSTRUCTION. Following technical professionals are appointed by Owner/ Promoter () MR. SANDEEP PANDIT for SANDEEP PANDIT ARCHITECTS as Architect. (ii) AAJ ENGINEERS as Structural Consultant. (iii) SANDEEP PANDIT ARCHITECTS as MEP Consultant (iv) SHAIWAL LAKHAN YADAV as Site Supervisor Based an Site Inspection, with respect to the Budding of tie aforesaid Real estate project, I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project as registered vide number - {in Process)-under RERA Sas per table Aherein below. The percentage of the work executed with respect to each Of the major activity of the Building and overall Percentage of work done of development work with rasped to the Building is detailed in the Table B. Email:sandeeprpandit@gmail com & spa_ngp@yahoo in Table A Building - G+17 Residential Floors Sr. Tasks /Activity Percentage of No work done 1 Excavation 100 % 2 Plinth 80% 3 Podiums N.A. Ground Floor 15 % 5 Super Structure 15 % 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0.0 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0.0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water 10% Tanks The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 0.0 % 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOc, finishing to entrance lobby/s, plinth protection, paving of 0.0 % areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Reistered Phase Common areas and Facilitles, Percentage S.No. Proposed of Details Amenities (Yes/No) Work done Internal Roads &Footpaths N.A. N.A. N.A. 2 Water Supply YES 0% Borewelland Well 3. Sewerage (chamber, lines, Septic YES 0% As PerPlan Tank, STP) 4. Storm Water Drains YES 0% As Per Plan 5 Landscaping &Tree Planting YES 0% As Per Plan 6. Street Lighting N.A. N.A. N.A. 7 Community Buildings N.A. N.A. N.A, Treatment and disposal of sewage N.A. N.A. N.A. and sullage water 9 Solid Waste management & Disposal N.A. N.A. N.A. Water conservation, Rain water 10. YES 0%, As Per plan harvesting 11. Energy management N.A. N.A. N.A. 12. Fire protectlon and fire safety YIS (0% requirements As Per Plan 13. Electrical meter rOom, sub statlon, YES (0% As Per Plan rocelving station 14. Others(Optlon to Add more) Yours falthfully SANDIEP PANDT *NAGn (License N0, -CA/2010/ 492 11)