FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project Wise) Date: - 24/01/2025 To, M/S SHREE CONSTRUCTION Laxmi Nagar, Nagpur. Subject: - Certificate Of Cost Incurred for Development OF SHREE MENSION. OnPlot No. - EWS, Kh. No. - 107/3-7 & 107/4, CTS. NO. -628 & 629, Sheet No. - 41 (593), PSK NO. - 44, Ward No. 74, House No. - 989/A/A and B, , Mouza - JAITALA, Tah. & Dist. Nagpur having MAHARERA Registration Number being developed by M/S SHREE CONSTRUCTION for the quarter ending Sir, I, MR.VIKESH D. MESHRAM have undertaken assignment of certifying estimated cost for Project Name having MahaRERA Registration Number being developed by M/S SHREE CONSTRUCTION. 1. Ihave estimated the cost CIVIL, MEP and other allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developers/ Consultants. The schedule of items and quantity required for the entire work as calculated by MR. VIKESH D. MESHRAM OQuantity Surveyor* appointed by the Developer/ Engineer, and the assumption of the cost of material labour and other inputs made by developers, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 2 We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 12,01,21,000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of completion of internal and external works, as per the apartments and proportionate specification mentioned in agreement of sale and for the purpose of obtaining occupation Development Building (s)/Wings (s)/Layout/ Plotted certificate / completion certificate for the whose jurisdiction the from the being the Planning Authority under aforesaid project is being implemented. calculated at Rs 1,02,00,000.00 (Total of Table A and B). 3 The Estimated Cost Incurred till date is material/services calculated on the basis of input The amount of Estimated Cost Incurred is used and unit cost of these items. completion of the of the Civil, MEP, and Allied works for 4. The Balance Cost of Completion works, as per completion of internal and external apartments and proportionate Project is estimated at agreement of sale of the specification mentioned in Rs. 10,99,21,000.00 (Total of Table A and B). proportionate internal and that the cost of Civil, MEP and allied work for the apartments 5 Certify aforesaid Project as mentioned in agreement of sale of the external works, as per specification given in Table A & B below: completed on the date of his certificate is as TABLE-A or called (To be bearing Number Building/ Wing/ Layout / Plotted Development Estate Layout/ Plotted Development of the Real prepared separately for each Building/Wing/ Project ) Particulars Amount (In Rs.) Sr. No Layout / Plotted 12,01,21,000.00 Wing/ 1 Total Estimated cost of Building/ Development of As On Date of Registration is 1,02,00,000.00 2 Cost Incurred as on 8.49 % Of Estimated Cost) 3 Work Done In Percentages (As Percentage Estimated Cost) 10,99,21,000.00 Balance Cost To Be Incurred (Based On The NIL Items not included in the Cost Incurred In Additional /Extra Estimated Cost (Table C) TABLE-B Registered Phase Internal& External Development Works in Respect of the Amount (In Rs.) Sr. Particulars No 1 Total Estimated Cost of the Internal & External Development N.A. Works Including Amenities and Facilities in the layout as on date of Registration is N.A. 2 Cost Incurred as on 3 Work Done in Percentage (As 4 Balance Cost to be Percentage of the Estimated Cost) NA Incurred (Based on the Estimated Cost) 5 Cost Incurred on Additional NA /Extra Items not inciuded in the Estimated Cost (Table - C) NA. Yours Faithfuly, Er. VIKESH D. MESHRAM (License No. NIT/4678/511) SHRAM NGINE Signature of Promoter signature dt EngiƱeer Note 1. The scope of the works is complete Registered Real Estate Project as per the drawings approved from the time to time and as per specifications mentioned in agreement of sale. 2. Quantity Survey can be done by office of Engineer or can be done by independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent Quantity Surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, who is responsible for the quantity calculated should be mentioned at the marked (*). 3. (**)Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (1) and ActualCost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this estimated cost, any deviation in quantity required for development of the Real Estate Project will be result in amendment of the cost incurred / to be incurred. 4 Allthe components of work with specifications are in indicative and not exhaustive. 5 Please specify if there are any deviation/ qualifications. Example: Any deviation in liquid material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/Deleted Items considered in Cost (which were not part of the Original Estimate of Total Cost) Sr. List of Extra/Additional/Deleted ltem Amount (In Rs.) No NIL