FORM 1 (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) ARCHITECT'S CERTIFICATE Date : 31.01.2025 To, Om Buildcon SUBJECT : Certificate of Percentage of Completion of Construction Work of Shubhangi Heights having MahaRERA Registration Number : _____________ situated on Plot No. 120 & 121-A in Khamla Plot Holders Co. Op. Ho. Society Layout on Kh. No. 71,72,73 of Mouza Khamla, Nagpur, Tah-Dist Nagpur, being developed by Om Buildcon. Sir, I Kshitij Shirkhedkar have undertaken assignment as Architect of certifying Percentage of Completion of Construction work of Shubhangi Heights, having MahaRERA Registration Number : _____________being developed by Om Buildcon. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered under MahaRERA is as per the Table A enclosed herewith. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B enclosed herewith. TABLE A : PERCENTAGE OF WORK COMPLETED Shubhangi heights Percentage Sr. Tasks / Activity of Work No. Completed 1 Excavation 0% a) 0 (Nil) number of Basement(s) a) N.A. 2 b) Plinth b) 0% 3 0 (Nil) number of Podiums N.A. 4 Stilt Floor 0% 5 Eight (8) number of Slabs of Super Structure 0% a) Internal Walls, a) 0% b) Internal Plaster, b) 0% 6 c) Floorings within Flats/Premises, c) 0% d) Doors and Windows to each of the Flat/Premises. d) 0% a) Sanitary Fittings within the Flat/Premises, a) 0% 7 b) Electrical Fittings within the Flat/Premises. b) 0% a) Staircases, a) 0% b) Lifts Wells, b) 0% 8 c) Lobbies at each Floor level connecting Staircases and Lifts, c) 0% d) Overhead and Underground Water Tanks. d) 0% a) The external plumbing and external plaster, a) 0% 9 b) Elevation, b) 0% c) Completion of terrace with waterproofing of the Building. c) 0% a) 0% a) Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, b) 0% b) Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, 10 c) Finishing to entrance lobby/s, plinth protection, paving of areas c) 0% appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate. AR KSHITIJ SHIRKHEDKAR DADO DESIGN LABS CA/2006/37707 Agreed and Accepted by Developer OM BUILDCON Date : TABLE B INTERNAL & EXTERNAL DEVELOPMENT WORKS IN RESPECT OF THE ENTIRE REGISTERED PHASE Percentage Sr. Common areas and Proposed of Work Details No. Facilities, Amenities (Yes/No) Completed 1 Internal Roads & Footpaths No 0% 2 Water Supply Yes 0% Sewerage (chamber, lines, 3 Yes 0% Septic Tank , STP) 4 Storm Water Drains Yes 0% Landscaping & 5 Yes 0% Tree Planting 6 Street Lighting No N. A. 7 Community Buildings No N. A. Treatment and disposal of 8 No N. A. sewage and sullage water Solid Waste management & 9 No N. A. Disposal Water conservation, 10 Yes 0% Rain Water harvesting 11 Energy management No N. A. Fire protection and fire safety 12 Yes N. A. requirements Electrical Meter room, Sub- 13 No N. A. station, Receiving Station Others 14 No N. A. (Option to Add more) AR KSHITIJ SHIRKHEDKAR DADO DESIGN LABS CA/2006/37707 Agreed and Accepted by Developer OM BUILDCON Date :