RAMDAS V WAGH (BE Civit) H. No. 501, Near Sangh Buitding, Mahat Nagpur 88888489s9 FORM.2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALTTY ASSURANCE (Site Supervisor's Certifi cate) (To be submifted at the end of Financial Year) Date: $ I.o3 .9o26 To, The Rajoli lnfra Rrt Ltd Nagpur (M Corp.), Nagpur (Urban), Nagpur, M0O12 Quality Assurance Gertificate (Certificate No. ......................for the Year Ending ..2#.:2.0........1 Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of RAJOLI 9EEFNS_1 having MahaREM Registration Number P505000802.51 being developed by Rajoti tnfra Pvt Ltd Sir, true R.:.Yi.[.hJ.J.. have undertaken an assignment of supervision of this real estrate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been No conducted before the structural design and soil parameters have been accounted foi in the structural desiqn/drawinqs? 2 Whether Structural Engineer has been appointed for No the oroiect? 3 Whether the inspection registers, site order book No and quality controltest registers are maintained at the site properiy and endorsed by the Engineer-in- Charqe? 4 Whether testing facilities to check quaiity of material No is available at site? 5 Whether the statuary provisions for disaster No resistance/earthquake resistant design have been incorpcrated, spricially in case of muTti-storeyed construction? Page 1 of3 Sr. No. Parameters Yes/No Remarks 6 Has suitable cognizance been taken on demarcated No flood lines and appropriate precautions taken for prote.cting the site from flooding considering local floodino issues? 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 Wheiher the foliowing building materials confirm to Yes relevant lS/BS/NBC Code. or as Der lndustrv Stqpdards? lf yes, provide detaild: (a) Cement, concrete and coarse aqqreqate Yes 53 GRADE (b) Steei and its allovs Yes 5OOFE (c) Electricalwire, fittinqs and accessories Yes ISI MARK (d) Plumbins and sanitary fittinqs Yes ISI MARK 2 Whether regular tests of materials and construction Yes STANDARDISED TESTING LABS products are being done from accredited labs also? lf yes, details of such labs 3 Whether manufacturer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are beinq maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes (ii) Has water been tested and approved bv No - Enqineer-in-Charge before consiruction? (iii) Has water been tested subsequenfly as per No Iqquirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical No wiring/connections/lift installationiother electrical installations have been carried out under authorized/registered electrical engineer and yqlether records of the same has Seen maintained? 2 Whether all related works of plumbing & sanitary No including installation of water supply iystems, drainage systems, sewage systemS, slnks, tojlets etc. have been carried out under authorized/registered pl umbers/sanitary contractors and whether records of the same has 6een maintained? 3 Whether allthe work is being carried out under No gupervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark anO the r)vork is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Wlrether remedial measures are undefiaken to No prevent dampness and leakages? lf yes, provide details 5 Whether safety precautions are undertaken during No construction aclivities for all type of workers? Page 2 of3 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? lf Ves, provide details. 2 Whether anti-termite treatment has been undertaken No for the soil? 3 Whether fire-fighting arrangements has been No undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on No site/completed building as per requirement? 5 Whether precautions are undefiaken to avoid air No pollution during construction? Please soecifv. 6 Whether records of all test reports/results have been No properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the assdciation of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovativeicost effectiveigreen tech nology has No been used for improving quality/energy efficiehcy? Please soecifv. ,ITT'\\ Yours F ffi\,4 s* {[ relof Name: Ramdas Wagh Wi:i,!-)#,,// o-/i^- ) Qualification (Not less than graduate) License No. (if any): 4085 Phone No: Ptace:lt)lr$1* Agreed d accepted [y / Signaturerffiomoter Name: Rajoli lflfra P\r,t Ltd Date: ! l-.0I ,2o LG Page 3 of 3