Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: To, K.K. ASSOCIATES NAGPUR, MAHARASHTRA, 440010 Subject : Certificate of percentage of Work of completion of construction work of DIVYAM APARTMENTS having MahaRERA Registration Number P50500080211 (Only Applicable after project Registartion) being developed by K.K. ASSOCIATES Sir, I/We AMIT KASHINATHJI DHAGE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of DIVYAM APARTMENTS having MahaRERA Registration Number P50500080211 (Only Applicable after project Registration, being developed by K.K. ASSOCIATES ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: DIVYAM APARTMENTS/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 100.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 85.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 85.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 90.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 25.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 85.00 AS PER NMC NORMS 3 Sewerage (Chamber, Lines, Septic Tank , STP) No 0.00 NA 4 Storm Water Drains Yes 90.00 AS PER NMC NORMS 5 Landscaping & Tree Planting Yes 0.00 AS PER NMC NORMS 6 Street Lighting Yes 0.00 AS PER NMC NORMS 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water Yes 0.00 AS PER NMC NORMS 9 Solid Waste Management And Disposal Yes 70.00 AS PER NMC NORMS 10 Water conservation /Rain water harvesting Yes 90.00 AS PER NMC NORMS 11 Energy managemcnt Yes 0.00 AS PER NMC NORMS 12 Fire protection and fire safety requirements Yes 40.00 AS PER NMC NORMS 13 Electrical meter room, sub-station, receiving station Yes 0.00 AS PER NMC NORMS 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully AMIT KASHINATHJI DHAGE Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2012/56909 NIT NO 2544 NMC/R-610) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: K.K. ASSOCIATES Date: Page 3 of 3