Shop no.UG3 , “Yogikrupa Apartment “ opposite kacchi visa ground , AVG layout , Lakadganj , Nagpur – 440008 DEVINE ARCHITECTS Mobile no – 9766963495 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 16-12-2024 To, ANJANEYA INFRA, 401, Shree Govindraj Heights, Geetanjali Square, Nagpur-18 Subject: Certificate of Percentage of Completion of Construction Work of ANJANEYA GREENS 2 having MahaRERA Registration Number _____________________ being developed by ANJANEYA INFRA. Sir, I/ We DEVINE ARCHITECTS have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of ANJANEYA GREENS 2 having MahaRERA Registration Number __________________ being developed by ANJANEYA INFRA. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number ANJANEYA GREENS 2 Sr Task / Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation NA 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth NA 5. Stilt Floor NA 6. Slabs of Super Structure NA 7. Internal walls, Internal Plaster, Floorings, Doors and Windows NA within Flats/Premises 8. Sanitary Fittings within the Flat/Premises NA 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and NA Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of NA terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number ____________________ Sr. No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& YES 0 Footpaths 2. Water Supply YES 0 3. Sewerage (chamber, lines, Septic YES 0 Tank, STP) 4. Storm Water Drains YES 0 5. Landscaping & Tree Planting YES 0 6. Street Lighting YES 0 7. Community Buildings NO 0 8. Treatment and disposal of YES 0 sewage and sullage water 9. Solid Waste management & NO 0 Disposal 10. Water conservation, Rain water YES 0 harvesting 11. Energy management NO 0 12. Fire protection NO 0 And fire safety requirements 13. Electrical meter room, sub- YES 0 station, receiving station 14. Others (Option to Add more) NO 0 Promoter’s Sign Authorized Signatory