Table A Building Number LAKE SHORE OASIS Sr. Tasks / Activity Percentage No of work done 1 Excavation 100% 2 Basements (if any) Nil 3 Podiums (if any) Nil 4 Plinth 90% 5 Stilt Floor 90% 6 Slabs of Super Structure 90% 7 Internal walls, Internal Plaster, Floorings, Doors and 5% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 50% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Mis Ekvee a cta � iro:te � A�S�natorv