FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/01/2025 To, Saraswa Infra, Flat No. F-1, Anjani Apartment, Pratap Nagar, Nagpur-440022, Subject: Certificate of Percentage of Completion of Development/Construction Work of Project SARASWA PEARL NEST situated at Mouza Wagdara, on the Kh. No No 58-A-3, Tah Hingna, Dist. Nagpur being developed by M/s SARASWA INFRA. Sir/Madam, I/ We V. V. Talwekar have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Project SARASWA PEARL NEST situated at Mouza Wagdara, on the Kh. No 58-A-3, Tahsil Hingna, District Nagpur 441110 being developed by M/s Saraswa Infra. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number_____(to be prepared separately for each Building /Wing of the Project) Sr.No Tasks/Activity Percentage of Work Done 1 Excavation NA 2 _________ number of Basement(s) and Plinth NA 3 _________ number of Podiums NA 4 Stilt Floor NA 5 __________number of Slabs of Super Structure NA 6 Internal walls, Internal Plaster, Floorings within NA Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical NA Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level NA connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, NA elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting NA Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Project Common Areas and Facilities, Proposed Percentage of Sr No Details Amenities (Yes/No) Work Done 1 Internal Roads & Foothpaths Yes 0% 2 Water Supply Yes 0% Sewarage (chamber, lines, Septic Tank 3 , STP) Yes 0% 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting Yes 0% 7 Community Buildings No NA As per Treatment and disposal of sewage and NMRDA 8 sullage water Yes 0% Norms 9 Solid Waste management & Disposal No NA Water conservation, Rain water 10 harvesting Yes 0% 11 Energy management No NA Fire protection and fire safety 12 requirements No NA Electrical meter room, sub-station, 13 receiving station Yes 0% 14 Others ( Option to Add more) NA NA NA Agreed & Accepted Partner/Authorized Signatory Krishna Ramkumar Singh Yours Faithfully V V Talwekar NMC Lic. No.1038 NMRDA Lic No.0241 NIT Lic No.4293 Date: 20-01-2025