B.R.PIPARHETE Consulting Architect & Civil Engineer. A WING 202, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR-440012. E-mail:-bhushanpip2023@gmail.com FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) For Year Ending 31ST March 2026 (F.Y 2025-2026) Date: 09/04/2026 To, SMC INFRA 201-204, BrijBhumi, Central Avenue, Near Telephone Exchange, Kotak Bank, Nagpur-440035 Quality Assurance Certificate st (Certificate No........................ for the Year Ending 31 March 2026) Subject: Certificate for quality of materials used and quality of Construction and workmanship of the work GOVIND PARK having MahaRERA Registration Number P50500079061 being developed by SMC INFRA Sir, I/We B R PIPARHETE have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailingand applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as perNBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has No beenconducted before the structural design and soilparameters have been accounted for in thestructural design/drawings? 2 Whether Structural Engineer has been appointed No forthe project? 3 Whether the inspection registers, site order Yes Inspection registers, site order book, bookand quality control test registers are andquality control registers are properly maintained atthe site properly and endorsed by the maintained and end or sed. Engineer–in-Charge? 4 Whether testing facilities to check quality of No materialis available at site? Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for No disasterresistance/earthquake resistant design have been in corporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on Yes Flood lines and local flooding demarcatedflood lines and appropriate precautions precautionsare taken care of but the Area taken forprotecting the site from flooding doesn'tcomes under Flood Affected considering localflooding issues? Zone. 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm Yes torelevant IS/BS/NBC Code, or as per IndustryStandards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes OPC/PPC cement (such as Ultratech.ACC, Ambuja) all Confirming to IS:456.Readv Mix Concrete (RMC) (b) Steel and its alloys Yes Fe 500/550 grade (such as Tata, JSW, orequivalent) as per IS:1786 (c) Electrical wire, fittings and accessories Yes Polycab, Havells) along with modularswitches and MCBs confirming to IS:732and IS:3043 (d) Plumbing and sanitary fittings Yes CPVC/UPVC (such as Astral, Supreme, Finolex) like Cera. Jaguar or equivalent conforming to IS:4985 and IS:13592. 2 Whether regular tests of materials and construction Yes GEOTECH LAB products are being done from accredited labs also?If yes, details of such labs 3 Whether manufacturer test certificate for Yes Manufacturer's test certificates cement,steel, pipes etc. have been obtained and forcement, steel, pipes, etc., are whethersupply records are being maintained? obtainedand supply records maintained. 4 Whether suitable water is being used Yes forconstruction? (i) What is the source of water? Yes CORPORATION WATER SHALL BEPROVIDED (ii) Has water been tested and approved Yes byEngineer-in-Charge before construction? (iii) Has water been tested subsequently as Yes perrequirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes Electrical works including wiring, lift wiring/connections/lift installation/other electrical installations, etc., carried out by installations have been carried out authorized electrical engineers with underauthorized/registered electrical engineer and records maintained. whether records of the same has been maintained? 2 Whether all related works of plumbing & Yes All works are under supervision of sanitaryincluding installation of water supply skilledprofessionals, and systems,drainage systems, sewage systems, sinks, workmanship/quality issatisfactory within toiletsetc. have been carried out permissible limits. underauthorized/registered plumbers/sanitary contractorsand whether records of the same has beenmaintained? 3 Whether all the work is being carried out Yes works are under supervision of skilled undersupervision of experienced and skilled professionals, and workmanship/quality is professional?Further, whether the workmanship and satisfactory within permissible limits. quality issatisfactory and up to the mark and the work iswithin the acceptable and permissible limits ofdeviations as per relevant Code of Practice? Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken Yes Remedial measures against toprevent dampness and leakages? If yes, dampnessand leakage undertaken - providedetails Dr. Fixit K2Crete used. 5 Whether safety precautions are undertaken Yes Safety precautions for workers duringconstruction activities for all type of duringconstruction are being workers? followed. 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is No beingcarried out on site during/after completion of theworks? If yes, provide details. 2 Whether anti-termite treatment has been Yes Anti-termite treatment for the soil has been undertakenfor the soil? duly carried out in accordance withthe approved specifications 3 Whether fire-fighting arrangements has been No undertaken under supervision of fire consultant? 4 Whether proper sign ages have been installed No onsite/completed building as per requirement? 5 Whether precautions are undertaken to avoid No airpollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes The records of all test reports and results properly kept in the prescribed formats and whether appear to have been maintained. the same area available at site for viewing by allot tees and to be handed over to the association of allot tees? 7 Whether all relevant records including sanctioned Yes All relevant records including building plans, utility drawings, various sanctionedplans, utility drawings, test testreports/results have been properly kept in reports areproperly kept and will be theprescribed formats to be handed over to the handed over to the association of allot association of allot tees? tees. 8 Any innovative/cost effective/green technology Yes RAIN WATER HARVESTING hasbeen used for improving quality/energy efficiency?Please specify. Yours Faithfully Bhushan Digitally signed by Bhushan Agreed and accepted by Rajesh Rajesh Piparhete Date: 2026.09.07 Piparhete 18:14:57 +05'30' Signature of Engineer (Site Supervisor) Name: B R PIPARHETE Signature of Promoter Qualification (Not less than graduate) Name: SMC INFRA License No. (if any): NA Date:09/04/2026 Phone No: Place: