B.R.PIPARHETE Consulting Architect & Civil Engineer. A WING 202, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR-440012. E-mail:-bhushanpip2023@gmail.com FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 09/04/2025 FOR YEAR ENDING 31st MARCH 2025 ( F.Y.2024-2025) To, SMC INFRA 201-204, BrijBhumi, Central Avenue, Near Telephone Exchange, Kotak Bank, Nagpur-440035 Quality Assurance Certificate st (Certificate No........................ for the Year Ending 31 March 2025) Subject: Certificate for quality of materials used and quality of Construction and workmanship of the work GOVIND PARK having MahaRERA Registration Number P50500079061 being developed by SMC INFRA Sir, I/We B R PIPARHETE have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has No beenconducted before the structural design and soilparameters have been accounted for in thestructural design/drawings? 2 Whether Structural Engineer has been appointed No forthe project? 3 Whether the inspection registers, site order Yes Inspection registers, site order book, bookand quality control test registers are And quality control registers are maintained atthe site properly and endorsed by the Properly maintained and end or sed. Engineer–in-Charge? 4 Whether testing facilities to check quality of No materialis available at site? Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster No resistance/earthquake resistant design have been in corporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on Yes Flood lines and local flooding demarcatedflood lines and appropriate precautions precautionsare taken care of but the Area taken forprotecting the site from flooding doesn't comes under Flood Affected considering local flooding issues? Zone. 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm Yes torelevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes OPC/PPC cement (such as Ultratech.ACC, Ambuja) all Confirming to IS:456.Readv Mix Concrete (RMC) (b) Steel and its alloys Yes Fe 500/550 grade (such as Tata, JSW, orequivalent) as per IS:1786 (c) Electrical wire, fittings and accessories Yes Polycab, Havells) along with modularswitches and MCBs confirming to IS:732and IS:3043 (d) Plumbing and sanitary fittings Yes CPVC/UPVC (such as Astral, Supreme, Finolex) like Cera. Jaguar or equivalent conforming to IS:4985 and IS:13592. 2 Whether regular tests of materials and construction Yes GEOTECH LAB products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for Yes Manufacturer's test certificates cement,steel, pipes etc. have been obtained and forcement, steel, pipes, etc., are whether supply records are being maintained? obtainedand supply records maintained. 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes CORPORATION WATER SHALL BE PROVIDED (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes Electrical works including wiring, lift wiring/connections/lift installation/other electrical installations, etc., carried out by installations have been carried out under authorized electrical engineers with authorized/ registered electrical engineer and records maintained. whether records of the same has been maintained? 2 Whether all related works of plumbing & Yes All works are under supervision of skilled sanitaryincluding installation of water supply professionals, and workmanship/quality is systems,drainage systems, sewage systems, sinks, satisfactory within permissible limits. toilets etc. have been carried out under authorized/ registered plumbers/sanitary contract or sand whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes works are under supervision of skilled supervision of experienced and skilled professional? professionals, and workmanship/quality is Further, whether the workmanship and quality is satisfactory within permissible limits. satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes Remedial measures against dampness prevent dampness and leakages? If yes, and leakage undertaken - Dr. Fixit providedetails K2Crete used. 5 Whether safety precautions are undertaken during Yes Safety precautions for workers construction activities for all type of workers? during construction are being followed. 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is No beingcarried out on site during/after completion of theworks? If yes, provide details. 2 Whether anti-termite treatment has been Yes Anti-termite treatment for the soil has been undertakenfor the soil? duly carried out in accordance withthe approved specifications 3 Whether fire-fighting arrangements has No beenundertakenundersupervisionoffireconsultan t? 4 Whether proper sign ages have been installed No onsite/completed building as per requirement? 5 Whether precautions are undertaken to avoid air No pollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes The records of all test reports and properly kept in the prescribed formats and whether resultsappear to have been maintained. the same area available at site for viewing by allot tees and to be handed over to the association of allot tees? 7 Whether all relevant records including Yes All relevant records including sanctionedbuilding plans, utility drawings, various sanctionedplans, utility drawings, test testreports/results have been properly kept in reports areproperly kept and will be theprescribed formats to be handed over to the handed over to the association of allot association of allot tees? tees. 8 Any innovative/cost effective/green technology Yes RAIN WATER HARVESTING hasbeen used for improving quality/energy efficiency?Please specify. Yours Faithfully Digitally signed by Bhushan Bhushan Rajesh Agreed and accepted by Rajesh Piparhete Date: 2026.09.07 Piparhete 18:15:32 +05'30' Signature of Promoter Signature of Engineer (Site Supervisor) Name: SMC INFRA Name: B R PIPARHETE Date:09/04/2025 Qualification (Not less than graduate) License No. (if any): NA PhoneNo: Place: