Soham Consortium Office Address: 85 Darshan Colony Nandanvan Nagpur -440009 Email: sohamconsortium@gmail.com Contact No: 9850777336 AnneXure B Date: 27-09-2o 24 FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE withdrawal of Money from (To be submitted at the time of Registration of Ongoing Project and for Designated Account-Project Wise) Date: To, RAJVAIBHAV INFRA Nagpur, MAHARASHTRA,440001 MahaRERA Registration Subject: Certificate of Cost Incurred for Development of Rajvaibhav Harmony having Number (Only Applicable after project Registartion) being developed by RAJVAIBHAV INFRA Sir, Rajvaibhav Harmony having MahaRERA I/We Soham Consortium have of Certifying Estimated Cost for by RAJVAIBHAV INFRA) Registration Number (Only Applicable after project Registration, being developed completion of the apartments and 2.We have Estimated the cost of Civil, MEP and allied works required for mentioned in agreements proportionate completion of internal & external works of the project as per specifications made available to us for the project under of sale. Our estimated cost calculations are bassd on the drawings/plans for the entire work as reference by the Developer / Consulatants. The Schedule of items and quantity required cost of material, labour and calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe / confirm the above analysis other inputs made by developer,and the site inspection carried out by us to ascertain given to us. under reference at Rs. 80000000.00 3. We estimate Total estimated the Cost of completion of thc aforesaid project Total Cost ofproject is with reference to thc Civil. (Total of Table and B) at the time of Registration. The estimated proportionate completion of internal & external MEP and Allied works required for completion of the apartments and purpose of the obtaining occupation Worksas per specifications mentioned in agreements of sale and for the Development from the Nagpur certificate /completion certificate for the Building(s) Wing(s)/ Layout /Plotted aforesaid project is being Municipal Corporation being the Planning ¢uthority under wiuse jurisidiction thc implemented. 3000000.00 (Total of Table A and B).The amount of 4.The Estimated Cost incured till date is calculated at Rs. materials/services used and unit cost of these items. Estimated Cost incurred is calculated on the basis of input works for completion of the apartments and 5. The Balance Cost of Completion of the Civil, MEP and Allied specification mentioned in agreement of sale., of the proportionate Complition of internal & external works, as per Page 1 ol Soham Consortium 1 Project is estimated at Rs 77000000.00 (Total of Table A and B) 6. Icertify that the Cost of the Civil, MEP and allied works the for the external works.as per spec1ficat1on mentioncd in apartments and proportionate ate internal & of this certificate is as qiven in agrcement of sale, of the aforesaid Project as completed on the date Table A and B below Table-A Build1ng/ Wing ILayout Plotted Development bearing Sr. No. Number :Rajvaibhav Harmony/NA 1 Total Estimated Cost of the Particulars Amount (In Rs.) 2 Building/Wing/Layout Plotted Development as on date of Registration is 80000000.00 Cost incurred as on date of 3 Work done in Percentage (ascertificate 3000000.00 4 Balance Cost to be Percentage of the estimated cost) 3.75 Cost Incurred on theIncurred**(Based on Estimated Cost) 77000000.00 Estimated Cost (Table-C)Additional/Extra items not included in the Page 2 ol Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 3 Work done in Percentage (as percentage of the estimated cost) Balance Cost to be Incurred"*(Based on Estimated Cost) 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) oHA SNO Yours Faithfully ae ER. PRAJ¤KTA AKHARE M. Tech (Structural Engg-), B.E. (Civi Engg-). EChartered Engine INDIA)1786193 SOHAM CONSORTIUM, Signature &Name (IN BLOCK LETTERS) with Stamp of Eng1neer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act| Local Authority license no. M-1786193 (if applicable) Date of Certificate: Agreed and Accepted by: Signature of Promoter Name: RAJVAIBHAV INFRA Date: 1.The sCope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. Surveyor,whose 2.(") Quantity survey can be done by office of Engineer or can be done by an independent Quantity certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned name of the person in the at the place marked () and in case quantity are being calculated by office of Engineer, the calculated should be mentioned at the place marked (*) office of Engineer, who is responsible for the quantity estimated Cost (1 ) and Actual 3.("*) Balance Cost to be incurred (4) may vary from Difference between Total As this is an estimated cost, any Cost incurred (2) due to deviation in quantity required /escalation of cost etc. amendment of the cost deviation in quantity required for development of the Real Estate Project will result in incurred / to be incurred. exhaustive 4 All components of work with specifications are indicative and not 5 Please specify if there are any deviations / qualifications. Example Any deViations in input material used from specifications in agreement of sale. Page 3of TABLEC List of ExtralAdditional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4