manate DESIGN Architecture Annexure A Plann ing & FORM 1 |nteriors [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 25/09/2024 To, RAJVAIBHAVINFRA NAGPUR, MAHARASHTRA, 440001 Subject :Certificate of percentage of Work of completion of construction work of Rajvaibhav Harmony having MahaRERA Registration Number (Only Applicable after project Registartion) being developed by RAJVAIBHAVINFRA Sir, IWe EMANATE DESIGN have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Rajvaibhav Harmony having MahaRERA Registration Number (Only Applicable after project Registration, being developed by RAJVAIBHAV INFRA ) Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project Icertify that as on the date of this certificate, the Percentage of VWork done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Block No. 1, 1JA,12, 3rd Floor, A-Wing (J.B Wing), Mangalwari Complex, Sadar, Nagpur -440001 | 9823872384, 7276384238 | emanatedesign9@gmail.com i www.emanatedesign. in Table A Layout/Building/Wing Number: RAJVAIBHAV HARMONY/NA Sr. No. Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 100.00 1 |Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 Stilt Floor 6 0.00 Slabs of Super Structure 0.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 0.00 8 Sanitary Fitting within the Flat/Premises Sr. No. Tasks/Activity Percentage ofActual Work Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level 0.00 Overhead and Underground Water Tanks 0.00 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 0.00 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobbyls, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. dLoKESH KADU /CAI2007/39381 NMCR-402, NIT-2140 Table BCommon Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Percentage of Details Propose d (Yes / Actual Work Done (As on date of the No) Certificate) (1) (2) (3) (4) (5) 1 Internal Roads &Footpaths No NMC Water 2 |Water Supply Yes 830.00 after OC/ Borewell Yes 0.00 As per 3 |Sewerage (Chamber, Lines, Septic Tank, STP) sanction plan As per Storm Water Drains Yes 880 00 sanction plan Yes 00 As per Landscaping & Tree Planting sanction plan Street Lighting No 0.00 Community Buildings No No 888 00 00 8 Treatment And Disposal Of Sewage And |Sullage Water 9 Solid Waste Management And Disposal No 000 10 Water conservation /Rain water harvesting Yes S00 As per sanction 800 plan 11 Energy managemcnt No 12 Fire protection and fire safety requirements No &88 0.00 Yes 00 Meter panel 13 Electricalmeter room, sub-station, receiving shall be station provided 14 |Aggregate area of recreational Open Space No 00 15 Open Parking Yes 8 As per sanction No 800 plan 16 8 Yours Faithfully EMANATE DESIGN (Ar. Lokesh Kalu) Narte of Architect and Signature Ar. LOKESH KADU CAI2007139381 NMCR-402, NIT-2140 hyrged arnd arceptsd bhy Signaturo of Prornoter Narne: RAJVAIBHAV INFRA Date: 25/09/2024