ATUL G. KATKAR B.E. (CIVIL),AMIE, DCE CHARTERED & CONSULTING ENGINEER 98221 2s39s I 8208912462 ENGINEER'S CERTIFICATE Date 3110312026 To, work / Development work of suBJECT : Certificate of cost lncurred for construction situated on Plot No' 5A of Ankila the in the Project named named "SHREEKRUPA", Layout,KhasaraNo.:17l1,17t2,26t1;Mouza:Mankapur;Tehsil:Nagpur(urban)& Municipal Gorporation' bearing Property District : Nagpur; within the limits of Nagpur admeasuring 500.019 sq. rirts' area being lndex No. 01007640 and House No. : i26719; LTD' developed by R.P.M. INFRAVENTURES PVT' P50500078347 Reference : MahaRERA Registration Number Sir, I ER. SATISH RAtPURE have undertaken assignment of Certifying Estimated Cost for MahaRERA' to be named as the subject Real Estate Project proposed to be registered under ,,sHREEKRUpA,,, situated on plot No. 5A of Ankila Layout, Khasara No. . 1711 ,1712'2611'' (Urban) & District : Nagpur' within the limits of Nagpur Mouza : Mankapur; Tehsil : Nagpur No. 01007640 and House No.:126719; Municipal Corporation, bearing Property lndex other the North' 9 meter wide road to the south' demarcated by its boundaries Plot No 4A to area being to the west, admeasuring 500'019 sq' mts' Plots to the East and 9 meter wide road LTD' developed by R.P.M. INFRAVENTURES PVT' 1. Following technical professionals are appointed by the Promoter : (i) Ar. Raiesh Ramteke as L'S / Architect' (ii) Er. Satish Raipure as StructuralConsultant' (iii) Er. Satish Raipure as MEP Consultant (iv) Er. Atul Katkar as Site Supervisor (v) Shri Abhinav Nikam as Qualtity Surveyor'* occupation certificate/ completion 2. we have estimated the cost of the completion to obtainthe Building(s) of the project. our works, of Certificate, of the Civil, MEP and Allied us for the estrmated cost calculations are based on the Drawings/plans made available to and the schedule of items and prolect under reference by the Developer and consultants Abhinav Nikam Qualtity surveyor" quantity for the entire work as calculated by Shri appointedbyDeveloper,andtheassumptionofthecostofmaterial,labourandotherinputs carried out by us' made by developer' and the srte inspection 01, Dwarka Complex, Opposite to Besa Power House, Outer Ring Road, Ashirvad Nag16$hggrr. El : a2tkatkar@gmail.com project We estimate Total Estimated Cost of completion of the building(s) of the aforesaid under reference as Rs. 3.72.45.875/- (Total of Table A and B). The estimated Total Cost for of project is with reference to the Civil, MEP and allied works required to be completed the purpose of obtaining occupation certificate / completion certificate for the building(s) from Nagpur lmprovement Trust (N.l.T.) being the Planning Authority under whgse jurisdiction the aforesaid project is being implemented' Table A 4. The Estimated Cost lncurred titt date is calculated at Rs. 3.16.58.994/- (Total of amount of and B). The amount of Estimated Cost lncurred is calculated on the base of TotalEstimated Cost. of the The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) subject project to obtain Occupation Certificate / Completion Certificate from Nagpur A and B). lmprovement Trust (N.l.T.) is estimated at Rs. 55.86.881/- (Total of Table 6. I certify that the cost of the civil, MEP and allied work for the aforesaid Project as B enclosed herewith' completed on the date of this certificate is as given in Table A and Yours FaithfullY, ER. ATUL KATKAR Reg No. - AM1708689 Enclosed: 4v 'v{ 1) Table A 2) Table B *"\ sl; :tq.\-- 3) Annexure A \'4o--* Page 2 of 6 TABLE A (To be prepared separately for each Building /Wing of the Real Estate Project) Building / Wing bearing Number 1 or called "SHREEKRUPA" (Please Note : The Project has one and only Building viz. mentioned above) Sr. Particulars Amount in Rs. No. Total Estimated cost of the building/wing as on 31/03/2026 1 Rs. 3,72,45,875/- (date of Registration) Cost incurred as on 3110312026 2 Rs.3,16,58,994/- (based on the Estimated cost ) Work done in Percentage 3 8iYo (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.55,86,881/- Cost lncurred on Additional/Extra ltems as on 31/03/2026 not 5 Rs.0/- included in the Estimated Cost (as per Annexure A) {t !l< ,,;*il:l UW ER. ATUL KATKAR \{ \ ---/,*/ l+ci$I.Y:' Reg No. - AM1708689 * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (.) Quality survey can be done by office of Engineer or can be done by an independent Quatity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Page 3 of 6 TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. Particulars Amount in Rs. No. Total Estimated cost of the building/wing as on 31/03/2026 1 Rs. 3,72,45,875/- (date of Registration) Cost incurred as on 3110312026 2 Rs. 3,16,58,994/- (based on the Estimated cost ) Work done in Percentage 3 85% (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 55,86,881/- Cost lncurred on Additional /Extra ltems as on 3110312026 not Rs.0/- 5 included in the Estimated Cost (as per Annexure A) ER.XTUL KATKAR * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (.) Quality survey can be done by office of Engineer or can be done by an independent Quality Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Page 4 of 6 Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) Sr. Particulars Amount in Rs. No. . NO SUCH EXECUTIONS / EXPENSES TILL DATE. ER. ATUL KATKAR Page 5 of 6 Table C Statement for calculation of Receivables from the Sales of the Real Estate ect So ld Inv Recei Balance Carpet Area Unit Consideration as per ved Receivable S. No. Flat No. (in. sq. mtrs) Agreem ent/Letter of Allotm ent Amou S nt (l) (2) (3) (4) (s) (6) I 102 85.763 - NIL - (Allotted to Land Owner) 0.00 0.00 2 202 85.763 - NIL - (Allotted to Land Owner) 0.00 0.00 TOTAL 171.526 - NIL - (Allotted to Land Owner) 0.00 0.00 * Unit consideration as per agreement/letter of allotment and amount received does not include pass through charges and indirect taxes. Unsold Inventory Ready Recknor Rate as on the date of Certificate of the Residential / Commercial premises is mtrs. Unit Consideration Carpet Area S. No. Flat No. (As per Ready Reckoner (in sq. mtrs.) Rate) (1) (2) (3) (4) I 101 88.456 40,3t,82s 2 201 88.456 40,31,925 3 301 56.300 25,66,154 4 302 56.208 25,61,960 5 303 58.049 26,45,873 6 40r 56.300 25,66,154 7 402 s6.208 25,61,960 8 403 58.049 26,45,873 9 501 56.300 25,66,1s4 r0 502 56.208 25,61,960 11 s03 58.049 26,45,873 t2 601 56.300 25,66,154 l3 602 s6.208 25,61,960 t4 603 58.049 26,45,873 TOTAL 859.r4 3,91,59,598 ffi ER. ffi6f KATK-AR Reg No. - AM1708689 Page 6 of 6