FORM 1[see Regulation 3] (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) ARCHITECT'S CERTIFICATE Date: 30.6.2025 To, R.P.M. INFRAVENTURES PVT. LTD.. 104-105, VCA Complex, Civil Lines, 440001. SUBJECT:Certificate of Percentage of Completion of Construction Work of one andonly Building of the Project named SHREEKRUPA", bearing MahaRERA Registration Number: P50500078347, being developed by RP.M. INFRAVENTURES PVT. LTD. Sir, I Ar. Rajesh M. Ramteke haye undertaken assignment as Architect /Licesed Surveyor of certifying Percentage of Completion of Construction Work of the one and only Building of the Project named SHREEKRUPA", bearing MahaRERA Registration Number P50500078347, situated on Plot No.5A of Ankila Layout,Khasara No.: 17/1, 17/2, 26/1; Mouza : Mankapur; Tehsil :Nagpur (Urban) & District : Nagpur; within the limits of Nagpur Municipal Corporation, bearing Property Index No. 01007640and House No.: 12679; demarcated by its boundaries Plot No. 4A to the North, 9 meter wide roadto the South, Other Plots to the East and9meter wide road to the West: admasuring 500.019 sq. mts, area being developed by R.P.M. TNFRAVENTURES PVT. LTD. 1. Follówing technical professionals are appointed by Owner/Promoter: ) Ar. Raiesh Ramteke as L.5./Architect; (ii) En. Satish Raipure as MEP Consultant; (ii) Shri Abhinav Nikam as Site Supervisor; Ba_ed on Site Inspection, with respect to theaforesaid Real Estate Project , Icertify that as on the date of this certificate, the Percentage of Work done for one and onty building of the Real Estate Project as registered vide number P50500078347 under MahaRERA is as per table A herein below. The percentage of the wotk executed with respect to cach of the activity of the entire project is detailed in Table B. Yours Faithfully, cH DE AR. RAJESH M. RAMTEKE NAGPUS C.A/93/16633; NIT LS, No. 764, NMC L.S. No. 38 Enclosed: l) Table A :Percentage of Work Completed of each Building/ Wing 2) Table B:Internal &External Development Works inrespect of the Entire Registered Phase. TABLEA : PERCENTAGE OF WORK COMPLETED (To beprepared separately for each Building/ Wing of the Project) BUILDING / WING NUMBER:1 (Single Building Project) Percentage Sr. Tasks / Activity of Work No. Completed Excavation 100% a) Nil- number of Basement(s) a) -N/A 2 b) 100% b) Plinth -Nil- number of Podiums -N/A 4 Stilt Floor 100% 5 Seven number of Slabs of Super Structure 100% a) Internal Walls, a) 80 % b) Internal Plaster, b) 90 % 6 c) 10 % c) Floorings within Flats/Premises, d)Doors and Windows to each of the Flat/Premises. d) 0 % a) Sanitary Fittings within the Flat/Premises, a) 75 % 7 b) 35% b) Electrical Fittingswithin the Flat/Premises. a) 100 % a) Staircases, b) LiftsWells, b) 100 % c) Lobbies at each Floor level connecting Staircases and Lifts, c) 100 % d) Overheadlandar Underground Water Tanks. d) 30 % a) The external plumbing and external plaster, a) 15 % 9 b) Elevation, b) 60 % )Completion of terrace withwaterproofing of the Building. c)0 % a) Installation of lifts, water pumps, Fire Fighting Fittings and a) 0 % Equipment as per CFO NO0, b) Electrical fittings to Common Areas, electro, mechanical b) 0 % equipment, Compliance to çonditions of environnent/CRZ 10 NOC, c) Finishing to entrance lobby/s, plinth protection, paving of areas c) 0% appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate. AR. RAJESH M. RAMTEKE C.A./93/16633: NIT L.S. No. 764, NMC LS. No. 38 WAGPU TABLEB INRESPECT OF THE INTERNAL & EXTERNAL DEVELOPMENT WORKS ENTIRE REGISTERED PHASE Percentage Sr. Common arcas and Proposcd of Work Details No. Facilities, Amenities (Yes/No) Completed No 0% -Not Åpplicable - 1 Internal Roads & Footpaths 0% Stage not Reached Yet 2 Water Supply Yes Sewarage (chamber, lines, 10% Stage not Reached Yet 3 Yes Septic Tank, STP) 0% Stage not Reachd Yet, 4 Storm Water Drains Yes Stage not Reached Yet Landscaping & Yes 0% Tree Planting 0% - Not Applicable - 6 Street Lighting No 0% - Not Applicable - 7 Community Buildings No Treatment and disposal of No 0% - Not Applicable - sewage and sullage water Solid Waste management No 0% - Not Applicable - 9 & Disposal Water conservation, Yes 0% Stage not Reached Yet 10 Rain Water harvesting Yes 0% Stage not Reached Yet 11 Energy management Fire protection and fire Yes 0% Stage not Reached Yet 12 safety requirements' Electrical Meter room, Yes 0% Stage not Reached Yet 13Sub-station, Receiving Station Others -NI¢ 0% - Not Applicable - 14 (Option to Add more) AR. KAJESH M. RAMTEKE C.A.J93/16633; NIT L.S, No. 764, NMC L.S. No, 38 RPM INFRAVENTURES PVT.LTD. ENT "Director VAGPU NAGPUR