E-4, Akshay Heighi 11, Sai Nagar, Omkar Nagar Square, Manewada Ring Road, �fagpur - 27 E-mail : mrsassociat@yahoo.com 1:=��nr1�-.--=� .,_._..._..........,. ..._._..,,_ � __.....,. Cell: 9422107417. 9850343776 Fax: 0712-2705970 .A.RCHITEC ! URAL CONSUL TAfl!1 & STRUCTURAL DESiGNERS Annexure B FORM2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date:14 /07/26 To, Modern Arch Developers Nagpur, MAHARASHTRA,440032 Subject: Certificate of Cost Incurred for Development of Modern Height having MahaRERA Registration Number P50500078367(Only Applicable after project Registartion) being developed by Modern Arch Developers Sir, I/We M R Shelote & Associates have of Certifying Estimated Cost for Modern Height having MahaRERA Regist�ation Number P50500078367 (Only Applicable after project Registration, being developed by Modern Arch Developers ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer.and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of the aforesaid project under reference at Rs. 59350900.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works.as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 59350900.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5: The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and Page 1 of4 Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount {In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 0 Plotted Develo ment as on date of Re istration is 2 0 3 0 4 Balance Cost to be Incurred** Based on Estimated Cost 0 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost Table -C Yours Faithfully M R SHELOTE & ASSOCIATES M. R. SHELOTE Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer ARCHITECTURAL CONSULTANT & STRUCTURAL DESIGNER [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] L. s. No. NIT-486, NMRDA-NMRDNR/2025/APU00293 STATE-STATE/R/2025/APU16816 Local Authority license no. NIT-486 (if applicable) Date of Certificate: 14/07/26 - •• Agreed and Accepted by: . MODERN ARCH DEVELOPERS Signature ol Promoter �N�R Name: Modern Arch Developers Date: 14/07/26 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor.whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer.the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.AII components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3of4