/\f ( HITf c TIJR� I VN,Tll 11 ITF RIOR Annexure A FORM 1 [see Regulation 3) ARCHITECrs CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:06/04/26 To, MODERN ARCH DEVELOPERS NAGPUR, MAHARASHTRA, 440032 Subject: Certificate of percentage of Work of completion of construction work of Modern Height having MahaRERA Registration Number P50500078367 (Only Applicable after project Registartion) being developed by MODERN ARCH DEVELOPERS Sir, I/We SVK ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Modern Height having MahaRERA Registration Number P50500078367 (Only Applicable after project Registration, being developed by MODERN ARCH DEVELOPERS ) Based on Site Inspection.with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table 8. Table A Layout/Building/Wing Number: Modern Height/NA Sr. No. Tasks/Activity Percentage of Actual Work Done As on date of the Certificate 2 3 100.00 2 0.00 3 0.00 4 100.00 5 Stilt Floor 0.00 6 Slabs of Su er Structure 7 8 Nagari, Nagpur. Pin:440009 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and| 75.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 50.00 11 |Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fitings, mechanical equipment, compliance to conditions of environmen/CRZ NOC, Finishing to entrance lobby/s. plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase /Project Number) Sr.No Common areas and facilitles Is AvailablePercentage of Actual Details (Yos /No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 50.00 under Construction Sewerage (Chamber, Lines, Septic Tank,STP) Yes 50.00 under Construction Storm Water Drains No 0.00 NA Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 |Community Buildings No 0.00 NA Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain waterhavesting No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 80.00 under Constructíon 13 Electrical meter room, sub-station, receiving station Yes 100.00 under Construction 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking Yes 0.00 under Construction Yours Faithfully SVK ASSOCIATES Signature & Name (IN BLOCK LETTERS)of L.S/ Architect (License No: CA/2023/165395) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: Modern Arch Developers Date: 06/04/2026 Page 3 of3