E-4, Akshay Height I| Sai Nagar, Omkar Nagar Square, M. R. SHELOTE Manewada Ring Road, Nagpur - 27 E-mail mrsassociat@yah00 com Cell : 9422107417, 9850343776 Fax:0712-2705970 ARCHITECTURAL CONSULTANT &STRUCTURAL DESIGNERS Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 12 o9| 2024 To, MODERN ARCHDEVELOPERS NAGPUR, MAHARASHTRA, 440032 Subject :Certificate of percentage of Work of completion of construction work of Modern Height having MahaRERA Registration Number (Only Applicable after project Registartion) being developed by MODERN ARCH DEVELOPERS Sir, I/We MR SHELOTE & ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Modern Height having MahaRERA Registration Number (Only Applicable after project Registration, being developed by MODERN ARCH DEVELOPERS ) Based on Site Inspection, with respect to Layout /each of the Building/Wing of the aforesaid Real Estate Project | certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Modern Height/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3 1 Excavation 100.00 2 Basements (if any) 3 Podiums (if any) 4 |Plinth, 97.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Page 1 of 3 Percentage of Actual Work Sr. No. Tasks/Activity Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 |Underground Water Tanks 0.00 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance environmen/CRZ NOC, Finishing to entrance lobbyls, to conditions of protection, paving of areas appurtenant to Building/Wing, Compound Wall andall other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B -Common Areas (Internal and External Development Works) in respect of Registered Phase /Project Number) Proposed Percentage of Actual Details Sr.No Common areas and facilities (Yes/No) Work Done (As on date of the Certificate) (2) (3) (4) (5) (1) No Internal Roads &Footpaths Yes 0.00 Proposed Water Supply Proposed Sewerage (Chamber, Lines, Septic Tank,STP) Yes 0.00 3 Storm Water Drains No Landscaping & Tree Planting N N 6 |Street Lighting NG 7 Community Buildings Treatment And Disposal Of Sewage And Sullage Water No Solid Waste Management And Disposal No 10 Water conservation /Rain water harvesting No 11 Energy managemcnt No Yes 0.00 Proposed 12 Fire protection and fire safety requirements Yes 0.00 Proposed 13 Electrical meter room, sub-station, receiving station 14 Aggregate area of recreational Open Space No 15 Open Parking Yes 0.00 Proposed 16 No Yours Faithfully M. RSHÉLOTE ARCHITECTURAL CONSULTANT & STRUCTURAL DESIGNER LS No. NIT-486, NMRDA-389 MR SHELOTE & ASSOCIATES NMC-NMO/R/202 1/APL/01349 TE/RI2022/APL/04132 Signature &Name (lN BLOCK LETTERS) oF LSArchitect (License No: STATE/R/2022/APL/04132) Date of Certificate: 12l09 2024 Agreed and accepted by: MODERN ARCH PEVELOPERS Signature of Promoter Name: Modern Arch Developers PARTNER Date: il0912024 Page 3 of 3