FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: - 18/04/2025 To, R Rai Udyog Builders LLP, Through Partner Shri. Kishor Gopichand Rai Subject: - Certificate of Percentage of Completion of Construction Work of Rai Galaxy - IV having MahaRERA Registration Number P50500077687 (Only Applicable after project registration) being developed by R Rai Udyog Builders LLP through Partner Shri. Kishor Gopichand Rai. Sir, I/ We Sushil Tathe have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Rai Galaxy - IV having MahaRERA Registration Number P50500077687 (Only Applicable after project registration) being developed by R Rai Udyog Builders LLP through Partner Shri. Kishor Gopichand Rai Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout/Building/Wing Number Rai Galaxy - III (to be prepared separately for each Layout/ Building/Wing of the Project) Sr Task / Activity Percentage of No. (2) Actual Work Done (1) (As on date of the Certificate) (3) 1. Excavation 100 2. Basements (if any) 0 3. Podiums (if any) 0 4. Plinth 100 5. Stilt Floor 0 6. Slabs of Super Structure 50 7. Internal walls, Internal Plaster, Floorings, Doors and Windows 0 within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 0 and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 0 terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings and 0 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Proposed Percentage of No. Common areas and Facilities. (Yes/No) Work done Details (1) (2) (3) (As on date of (5) the 1. Internal Roads & Footpaths YES 0 2. Water Supply YES 0 3. Sewerage (chamber, lines, Septic YES 0 Tank, STP) 4. Storm Water Drains NO 5. Landscaping & Tree Planting NO 6. Street Lighting NO 7. Community Buildings NO 8. Treatment and disposal of sewage NO and sullage water 9. Solid Waste management & Disposal NO 10. Water conservation, Rain water YES 0 harvesting 11. Energy management NO 12. Fire protection YES 0 And fire safety requirements 13. Electrical meter room, sub-station, YES 0 receiving station 14. Others (Option to Add more)