WAVECAD DESIGN F-1, Radhika Apartment, Prashant Nagar, Near Ajni Sq, Nagpur. Mail: wavearch7(@ gmail.com Annexure - B FORM 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project Wise) Date: 01/04/2026 To The Ravi Raj Ventures Subject: Certificate of Cost Incurred for Development of Gajanan Nagri II having MahaRERA Registration Number P50500077692 (Only Applicable after project Registration) being developed by RaviRaj Ventures Sir, I Unmesh M Ingle have undertaken assignment of certifying Estimated Cost for Gajanan Nagri II having MahaRERA Registration Number P50500077692 (only Applicable after project Registration) being developed by Ravi Raj Ventures We have estimated the cost of Civl, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Enginer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.6,78,25,480.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for UNMES completion of the apartments and proportionate completion of internal & external Digitally signed H by UNMESH works, as per specifications mentioned in agreement of sale and for the purpose of MANOJ INGLE obtaining occupation certificate/completion certificate for the MANOJ 12:32:26 Date: 2026.06.08 +05'30 Building(s)/Wing(s)/Layout/Plotted Development from the Planning Authority under INGĻE whose jurisdiction the aforesaid project is being implemented. Unmesh Manoj Ingle B Tech (Civil) M. Tech (Structural Engineering) NMRDA/R/2025/APL/00272 Mo. 9176256659 The Estimated Cost Incurred tilldate is calculated at Rs. 89,75,000.00 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of the percentage of the work done with respect to the cost of the items. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. 5,88,50,480.00 (Total of Table A and B). I certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building/ Wing / Layout / Plotted Development bearing Number - or called (to be prepared separately for each Building / Wing / Layout/ Plotted Development of the Real Estate Project) Sr. No Particulars Amount (In Rs.) 1 Total Estimated Cost of the 6,78,25,480.00 Building / Wing / Layout / Plotted Development as on date of Registration is 2 Cost incurred as on date of 89,75,000.00 certificate 3 Work done in Percentage 13.23% (as Percentage of the estimated cost) 4 Balance Cost to be 5,88,50,480.00 Incurred** (Based on Estimated Cost) 5 Cost Incurred on Additional nil /Extra Items not included in the Estimated Cost (Table - C) TABLE B Internal & External Development Works in Respect of the Registered Phase Sr. No Particulars Amount (In Rs.) 1 Total Estimated Cost of the 2,20,00,000.00 Internal and External Development Works including amenities and UNMESH facilities in the Layout as on date of Registration is MANOJ INGLE 2 Cost incurred as on date of 85,00,000.00 Digitally signed by certificate UNMESH MAND INGLE Date: 2026.0$.08 3 Work done in Percentage 38.64 12:32:55 +06}0 (as Percentage of the Unmesh Manoj Ingle B.Tech (Civil) M. Tech (Structural Engineering) NMRDAR/2025/APL/00272 Mo. 9176256659 estimated cost) 4 Balance Cost to be Incurred 1,35,00,000.00 (Based on Estimated Cost) Cost Incurred on Additional /Extra Items not included in the Estimated Cost (Table - C) Yours Faithfully, UNMESH Digtaly /signed ANObyINGLE ..esh Manoj Ingle B.Tech (Civil) M. Tech (Structural UNMESH MANOJINGLE 12:33:06 Date: 2026.06.08 Engineering) +05"30' NMRDA/RI2025/APL/O0272 Mo. 9176256659 Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer (Not Less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act) Local Authority License No (If applicable) Agreed and Accepted by Signature of Promoter Name: Date: 01/04/2026 Note 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked () and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked () 3. (**) Balance Cost to be incurred may vary from Difference between Total estimated Cost and Actual Cost incurred due to deviation in quantity required / escalation of cost etc. As this is an estimated cost - any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /to be incurred. 4. All componentsof work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/ Additional/Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. No List of Amount (In Rs.) Extra/Additional/Deleted Items 1 NA NA 2 NA NA Digitally signed by UNMESH UNMESH MANOJ INGLE MANOJ INGLE Date: 2026.06.08 12:33:17 +05'30' Unmesh Manoj Ingle B.Tech (Civil) M. Tech (Structural Engineering) NMRDA/RI2025/APL/00272 Mo. 9176256659