R. D. A r c h i t e c t s & Consultants  Architect  Planner  Interior Designer Address: G-3, Flat No.104 , 1st Floor , Saikrupa Apartment, Near volley Ball Ground, ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 9/05/2024 SUBJECT : Certificate of Percentage of Completion of Construction Work of PLANWISE SAPPHIRE, The Residential building being developed at CTS No./Survey No. 40/37 , Plot No. 32 ,Kh-No.97, Mouza -Bhamti, Swavlambi nagar, Nagpur by Planwise Structures & Spaces Pvt Ltd I/We R.D.ARCHITECTS AND CONSULTANTS have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of PLANWISE SAPPHIRE, The Residential building being developed at CTS No./Survey No. 40/37 , Plot No. 32 ,Kh-No.97, Mouza -Bhamti, Swavlambi nagar, Nagpur by Planwise Structures & Spaces Pvt Ltd Based on Site Inspection, with respect to each of the Buildings /Blocks/Towers of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Buildings /Blocks/Towers of the Real Estate Project registered under MaHaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. Table A Sr. Percentage No. Task/Activity Work Done 1 Excavation of Building 0% 2 Basement 0% 3 Plinth 0% 4 Stilt Floor 0% 5 Podiums NA 6 Slabs of Super Structure 0% Internal walls, Internal Plaster, Flooring within Flats/Premises, Doors and 7 Windows in each of the Flats/Premises 0% Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 8 Flat/premises 0% Staircases, Lift Wells and Lobbies at each Floor level connecting Staircases and 9 Lifts, Overhead and Underground Water Tanks 0% The external plumbing and external plaster,Elevation, completion of terraces 10 with waterproofing of the Building /Block/Tower 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro-mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance 11 lobby/s, plinth protection, paving of areas appurtenant to Building /Block/Tower, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 0% R.D.Architects and Consultants Page No. :1 Table B Internal & External Development Works in Respect of the Entire Registered Phase S Common Areas and Proposed Percentage of Details No Facilities, Amenities (Yes/No) Work done 1 Internal Roads & Foothpaths No Not Applicable NA 2 Water Supply Yes Bore well . Yet to Start 0% RCC Drain with regular cathment Sewarage (chamber, lines, 3 Yes chambers Proposed Along road and Septic Tank, STP) along building periphery. Yet to Start 0% RCC Drain with regular cathment 4 Strom Water Drains Yes chambers Proposed Along road and along building periphery. 0% Plantation proposed Along road and 5 Landscaping & Tree Planting Yes along building periphery. Yet to Start 0% 6 Street Lighting No Not Applicable NA 7 Community Buildings No Not Applicable NA Treatment and disposal of Connection proposed to Municipal 8 No NA sewage and sullage water Main line. Refuge Chutes proposed at every Solid Waste management & 9 No floor with collection from lower NA Disposal froor. Water conservation, Rain Independent water conservation Pit 10 Yes water harvesting proposed for Township. Yet to Start 0% 11 Energy management No Not Applicable NA Fire protection and fire safety 12 No Yet to Start NA requirements Electrical meter room, sub- 13 Yes Yet to Start station, receiving station 0% 14 Other (Option to Add more) _______ _______ _____ Yours Faithfully Signature & Name Ar. RAHUL DESHPANDE R.D.ARCHITECTS & CONSULTANTS (License NO CA/2000/26055) R.D.Architects and Consultants Page No. :2