I +el e85032eeel o ,1 V Plot N0.215, Abhyankar Nagar, 0pp.Sangh Ground, Nagpur - 440010 p trr mail@ekveera.org EKV ARCH E ERA IT ECTS O www.ekveera.org FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 15/Ot/2025 To, LEVERAGE REALITIES, FF/l/2/3,4u, Floor, Girish Heights, LIC Square, Sadar, Nagpur-44OOO 1 (MH) subject: certificate of percentage of compretion of construction work of LE'ERAGE GREEN MEADows having MahaRERA Registration no. P5o5ooo77g69 being developed bv LEVEMGE REALTTIES. Sir, I/ We have undertaken assignment as Architect /Licensed surveyor of certifying percentage of completion of construction work of LEVERAGE GREEN MEADows, having MahaRERA Registration no. psosooo z7g69 being deveroped by M/S LEVERAGE RTALITIES. Based on site Inspection, with respect to the Buildings/Brocks/Towers of the aforesaid Real Estate project, I certi$ that as on the date of this certificate, the percentage of work done for the building of the Real Estate Project under MahaREM is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building Number Excavation Basementsnf an, Podiums (if ar$4 Slabs of Super StruEture Internal *u Windows within Flat/premises Sanitary Fita Staircases, Overhead and Underground Water Tanks External completion of terraces with waterproofing of the Building/Wing Installation . Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment /cRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any Other Activities. !F TABLE.B common Areas (Internar & External Deveropment worksf in Respect the entire Reglstered phase of / proJect Number I s.No. Common-arGs and- I Propos Percentag. of Details Facilities, Amenities l"a Actual Work I rusru done of (As on date of the certificate) 1 Iar Koacts th Footpaths No 9Oo/o NA 2. Water Supply Yes Oo/o AS PER SANCTIONED PLAN 3. Dswcrage (cnamber, lines, Yes Oo/o AS PER Septic Tank, STp) SANCTIONED PLAN 4. DLorm water Drains Yes 75o/o AS PER SANCTIONED I^-r^^^- pmg PLAN 5. d6'l'ree Planting Yes 15% AS PER SANCTIONED PLAN 6, Dlreef, Llgnung No 0 NA 7. !_ururnuntfy uulldings No o NA 8. r.rsaLrnen[ ano dtsposal of No o NA sewage and sullage water 9. ouuq waste management & No 0 NA Disposal 10. warer conservation/ Rain No 0 NA water harvesting 11. Energr management No 0 NA t2. Fire protection and lire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes ooh METER station, receiving station PANNEL SHALL BE PROVIDED Yours Faithfully M/s Ekveera Architects &u#ilisnatorr Ar. Parag Kotwal of M/s Ekveera Architects COA Reglstratlon No. CA/2OOt /285 15 Name of Architect & Signature Agreed and Accepted by: I.EVER{GE REAL'flES d5cy kuwtl . -- Name: Aiay Kumar #Hii$"ffir,fiSSignatory Date: LSlOll2O2S