e tl Date 37/03/2025 FORM.2A [See Regulation 3A.l ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certif icate) (To be submitted at the end of FinancialYear) To, The AKS INFRASTRUCTURE Nagpur (M Corp.), Nagpur (Urban), Nagpur,440024 Quality Assurance Certifi cate (Certificate No. 01 for the Year Ending 31-03-2025) Subrect: Certificate for quality of materials used and quality of Construction and workmanship of the work of AKS INFRASTRUCTURE having MahaRERA Registration Number P5OS(n077496 being developed by AKS INFRASIRUCTURE. Sir, I Mr. Ashok Mankawde have undertaken an assignment of supervision of this real estate project. Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Parameters Yes/No Remarks Sr. No. 1 er 50 has Yes before the structuraldesiSn and soil parametert have been accounted for in the structuraldesiSn/drawings? StructuralEngineer s been Yes 2 project? e the 5pection rs, site Yes Mostly maintained 3 q ality €on trol test registers are a inta ined at the site properly and e ndorsed by the Engineer-in- Charge ? r testing to q mater is NO available at site? 5r. No. Parameters Yes/No Remarks 5 et er e5 ary p ons or saster Yes resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed constructiOn? 6 as 5ur cogn zance non em NA flood lines and appropriate precautions taken for p rotecti s th site f fl d I nsi de (n8 fl oo d 55 ue5 ? 2. lnput Materials Sr. No Parameters Yes/No Remarks 1 eI ng U nc m ras Yes co nfi rm to re I eva n t ts/ B s/ N BC c od o r as per nd u S try s ta nd a rds ? f yes p t ov d e deta ils: a en , con e an coarse aggrega e YES (b) 5teel and its alloys Yes c ca wtre, ngs an accessories Yes um nga san ngs Yes 2 r reSu t s ma a an Yes construction products are being done from accredited labs also? lf yes, details of such labs 3 Whether manutacturer test cenilicate Ior Yes cement, steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable waIeaETei ng used tor Yes construction? (r) What is the source-f water/ Borewell & NMC water lI) Has water been tested and Yes approved by Engineer-in-Charge before construction? (iii) Has water been tested subsequentlt asjer Yes requirement? 3. Quality of Workmanship Sr. No Parameters Yes/No Remarks 1 er wor a ee e flca Yes wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether recordsofthe same has been maintained? 2 era p um ng san Yes including installation of water supply systems, drainagC systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors ant whether records of the same has been maintained? era e r5 e ng carne out un Yes 3 suoervision of experienced and skilled orofessional? Fuither, whetherthe workmanship 5nd oualitv is satisfactory and up to the mark and ihe work ii within the acceptable and permissible iimits of deviations as per relevant Code of Practice? Sr. No Parameters Yes/No Remarks 4 whether remedial measures are undeatef,en to NA prevent dampness and leakages? lf yes, provide details 5 Whether satety precautions are un(Grtaf,en Yes during construction activities for alltype of workers? 4. Miscellaneous Sr. No Parameters Yes/No No L Whether third pafr qutlfttl nspection is beinE NA carried out on site during,/after completion ofthe works? lf yes, provide details. 2 whether antr-termite treatment has been undertaken for the soil? 3 Whether tire-tight ing arrangementthas been Yes undertaken under supervision of f ire consultant? 4 Whether proper signJfes h ave been installetlon Yes site/completed building as per requirement? 5 Whether precautions aie un to avoid air Yes pollution during construction? Please specify. 6 Whether records of all test repo reSu S ave Yes been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 whether all relevant records including tanatione(f Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 innovative/cost eneatite/gre en technology NA has been used for improving quality/ene rgy efficiency? Please specify. Yours Faithfully i,'#,oXI*** tilI.3021 r,l0.L.111 Signature of Engineer (Site Supervisor) l' ''RD.o Name: Mr. Ashok Mankawade -q?t2t26W Qualification : Engineer Phone No:9372126588 Place:Nagpur Agreed and ac ce ted Signature romoter Name: AKS INFRASTRUCTURE Date: Room No.41 N.l.T. Block near main gate Kalamna Market ,Nagpur E-mail: ashokmankawde@gmail.com,shivanikanfade0@gmail.com Mobile No.-+91 9372126588 , +91 9975837107