Ashok Mankawade R/o :- Qtr No I/57 , Hanuman Mandir VHB Shanti Nagar Colony, Nagpur-440002 Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 30.06.2025 To, Rahul Lahuji Deshmukh and Yusuf Najmuddin Kanchwala Partner in AKS Infrastructure. Subject: Certificate of Cost Incurred for Development of “AKS INFRASTRUCTURE” having MahaRERA Registration Number P50500077496 (Only applicable after Project Registration) being Developed by Rahul Lahuji Deshmukh and Yusuf Najmuddin Kanchwala Partner in AKS Infrastructure. Sir, I / We Ashok Mankawade have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of “AKS INFRASTRUCTURE” having MahaRERA Registration Number P50500077496 (Only applicable after Project Registration) being Developed by Rahul Lahuji Deshmukh and Yusuf Najmuddin Kanchwala Partner in AKS Infrastructure. Based on the Site Inspection, with respect to the Layout / each building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number___ (to b prepared separately for eash Layout / Building / Wing OF Project ) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% Ashok Mankawade R/o :- Qtr No I/57 , Hanuman Mandir VHB Shanti Nagar Colony, Nagpur-440002 2. Basements (if any) 100% 3. Podiums (if any) 4. Plinth 100% 5. Stilt Floor 6. Slab of Super Structure 90% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats 60% / Premises 8. Sanitary Fittings within Flats / Premises 30% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead and 50% Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 25% Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 25% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / NO) (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths NO 2. Water Supply YES 3. Sewerage (Chamber, Lines, Septic YES Tank, STP) 4. Strom Water Drains YES 5. Landscaping & Tree Planting YES 6. Street Lighting YES 7. Community Buildings NO 8. Treatment & Disposal of Sewage and NO Sullage Water 9. Solid Waste Management & Disposal NO 10. Water Conservation / Rain Water YES Harvesting 11. Energy Management NO Ashok Mankawade R/o :- Qtr No I/57 , Hanuman Mandir VHB Shanti Nagar Colony, Nagpur-440002 12. Fire Protection & Fire Safety YES requirements 13. Electrical Meter Room, Sub-Station, YES Receiving Station 14. Others (Option to Add more) Yours Faithfully, ASHOK MANKAWADE Signature & Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number (Certificate No:- NMO/R/2023/APL/01819) Agreed & accepted by: Signature of Promoter Name: Yusuf Najmuddin Kanchwala Partner In AKS Infrastructure Date :