Mob. : 808713740 9822228189 RAJESH DADHE & ASSOCIATES . ARCHiTECT r SiRUCTURAL DESIGNER r INTERIOR DESIGNER OFFICE r 106, Ram Apa(ment, First Floo( 'liranga Sq., Near Sangam Cinema, Nagpur-440 009. E-mail : rajeshdadh€@gmail.com Annexure B FORU 2 lsee Regulat'on 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: To, Jai Gurudeo lnfrastructure Nagpur, MAHARASHTRA,440034 Subject: Certificate of Cost lncuned for Development of Jai Gurudeo Tower having MahaRERA Registration Number P50500077464 (Only Applicable after project Registartion) being developed by Jai Gurudeo lnfrastrueture Sir, l/We Rajesh Dadhe have of Certifying Estimated Cost for Jai Gurudeo Tower having MahaRERA Registration Number P50500077464 (Only Applicable after project Registration, being developed by Jai Gurudeo lnfrastructure ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works ofthe project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Ouantity Surveyor" appointed by Developer/Engineer, the assumplion ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Totat estimated the Cost of completion of thc aforesaid project under reference at Rs. 27509167.30 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for lhe purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the NAGPUR IMPROVEiTENT TRUST being the Planning Authority under whose .iurisidiction the aforesaid proiect is being implemented. 4-The Estimated Cost incured till date is calculated at Rs. 10956013.28 (Total of Table A and B).The amount of Estimaled Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionale Complition of internal & external works, as per specilication mentioned in agreement of sale, of the Project is estimated at Rs 16553154.02 (Total of Table A and B) 6. I cedify that lhe Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & extemal works,as per specification mentioned in agreement of sale, ofthe aforesaid Project as completed on the date of this certificate is as giv6n in Table A and B below: Table-A Building/ /Layout Plotted Development bearing Number :Jai Gurudeo Tower/NA Sr- No- Particulars Amount (ln Rs-l 1 Total Estimated Cost of the BuildingMing/Layout 27509167.30 Plotted Development as on date of Registration is 2 10956013.28 Cost incurred as on date of certificate Work done in Percentaqe (as Percentaqe of the estimated cost) 39.83 4 Balance Cost to be lncurred'"(Based on Estimated Cost) 16553154.02 5 Cost lncurred on the Add itional/Extra items not included in the 0 Estimated Cost (Table-C) Table B lnternal and External Development Works in respect of the R€gistered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the Building/vving/Layout 0 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certificate 0 3 Work done in Percentaqe (as percentaqe of the estimated cost) 0 4 Balance Cost to be lncurred'*(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully rRAJE HS DAEHE B.E, (clvlL) RAJESH DADHE . ,^EiIcErr FNGINEER & DESIGNER sisnature & Name (lN BLocK LETTERS) wlth stamp of Ensineer Etij[:i:,qii:l','fr=,-,)J;'.i;?li3;?6! lNot Less than bachelois Degree Holder or equivalent as per Scction ztrFpfitE Ni,4cR / RJrolsJ - i,ri: fl'L 1ofil6 |n",y."f ,i&, $.. o.!?ti+1,,G,^1"[Btt "soaziz zt o' Local Authority license no. (if applicable) S?'ff|'""' ""'XiS1'u i;1" Date of Certificate: Agreed and Accepted by: JAI GURUDEE INFRA$TRUCTURE Signature of Promoter ' a 72' ' $or+o dQ Name: Jai Gurudeo infrastructutrp.RTNER Date; 1 .The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per speciflcations mentioned in agreement of sale. 2-(.) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(..) Balance Cost to be incurred (4) may vary fiom Difference betlveen Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantlty required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive 5.please specifo if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost)