Mob, :8087n3t40 9822228189 RAJESH DADHE & A SSOCXATES . ARCHITECT T STRUCTURAL DESIGNER r INIERIOR DESTGNER OFFICE i 106, Ram Apartment, First Floor, Tiranga Sq., llear Sangam Cinema, Nagpur-440 009. E.mail : rajeshdadhe@gmail.com Annexura A FORirt I lsee Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: To, JAI GURUDEO INFRASTRUCTURE NAGPUR, MAHARASHTRA, 440034 Subject : Certificate of percentage of Work of completion of construction work of Jai Gurudeo Tower having MahaRERA Registration Number P50500077464 (Only Applicable after project Registartion) being developed by JAI GURUDEO INFRASTRUCTURE Sir, l/}Ve RAJESH DADHE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Jai Gurudeo Tower having MahaRERA Registration Number P50500077464 (Only Applicable after project Registration, being developed by JAI GURUDEO INFRASTRUCTURE ) Based on Site lnspection,with respect to Layout / each of the BuildingA/Ving of the aforesaid Real Estate Proiect I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each ofthe activity of the entire phase is detailed in Table B. Table A LayouuBuilding/wlng Number: Jai Gurudeo Tower/NA Sr, No, Tasks/Activity Percentage of Actual Work Done (As on dale of the Certificate) (1) (21 (3) 1 Excavation 100.00 2 Basements (i{ any) 0.00 3 Podiums (if anV) 0.00 4 Plinth 100.00 5 Stilt Floor 85.00 6 Slabs of Super Structute 85.00 7 lnternal walls, lnternal plastor, Floorings, Floors and windows within 55.00 Flats/Premises 8 Sanitary Fittinq within the FlauPremises 70.00 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Cerlilicate) 9 Staircases, lifts Wells and Lobbies at each Floor l6vel Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 55.00 wateroroofi no of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 15.00 CFO NOC, Electrical filtings, mechanical equipment, compliance to conditions of environmenucRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building,^/ving, Compound Wall and all other requirements as may be required to complete project as per spocifications in agreement of Sale. Any other activities. Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No common areas and facilities Is Available Percentage of Actual Details (Yes I No) Work Done (As on date of the Certificate) (1) lzl (3) (4) (5) ,1 lnlernal Roads & Footpaths No 0.00 NA 2 Water Supolv Yes 25.00 As per NIT 3 Sewerage (Chamber, Lines, Septic Ta!k, STP} Yes 25.00 As per NIT 4 Storm Water Drains Yes 0.00 As per NIT 5 LandscaDinq & Tree Plantino No 0.00 NA 6 Street Li No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage WateJ Yes 15.00 As per NIT I Solid Waste Manaqement And Disposal Yes 15.00 As per NIT 10 Water conservation /Rain water harvesting Yes 15.00 As per NIT 11 Enerqy manaqemcnt Yes 0.00 As per NIT 12 Fire pmtection and fire safety requirements Yes 15.00 As per NIT 13 Electrical meter room, sub-station, eqeiung s1A!iol1 Yes 15.00 As per NIT 14 Aqqregate area of recreational Open Space No 0.00 NA 15 ODen Parkina Yes 50.00 As per NIT Yours Faithfully RAJESH DADHE Signature & Name (lN BLOCK LETTERS) of L.S/ ( License No: PE/0'1307/16, N lT L S No 523 ST MRDA LS No- 370) Date of Certificate nsreea agf r6t Rtff fd'rnrnlsrnucTURE -< & Eot'dq Signature of Promoter Name: Jai Gurudeo lnfrastru.,rr#RTNER Date:*..