NITIN M.ZADE TICENCED ENGINEER L.S. NO. NtT.2445 NMC 573 NO.21, KUBER REGENCY NEARATL INDIA REPORTER PRESS CONGRESS NAGAR., NAGPUR. PH. NO.98229479!r5 Annexure C FORM - 2A (See MahaRERA Order No. 5 of 2O18) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE ( Site Supervisor's Certifrcate) (To be submitted at the end of Financial Year) Date:31-03-2025 To, Krishnagiri Developers Gitai Nagar Nalwadi Wardha Pin No.442001 QUALTTY ASSURAT{CE CERTTFTCATE (Certificate No 1 for the Year Ending 31st March 2025l, Subject Certificate for quality materials used and quality of Construction & workmanship for the work of "Uehaf,a!!..1Greens] having MahaREM registration Number P50s000773ss being developed by Krishnagiri Developers Partners M3hesh Shankarrao Gulhane. Sir, l, Nitin M. Zade have undertaken an assignment of supervision of this Real Estate Project. OUR RESPONS!BILITY I / We are responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in- situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. tu INPUT MATERIALS, FIXTURES & FITTINGS I / We hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E', of Agreement to Sale. For those items, where no specification have been mentioned in Agreement of Sale, the Materials, Fixtures and Fittings used conform to the relevant BIS Standard / lS / National Building Codes or as per lndustry Standards. l2l WoRKMANSHIP t / We hereby certify that the work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviation as per relevant code of practice. 13] STRUCTURAL ENGINEER Promoters have engaged structural engineer Mr. having License No having Otfice No Cell No The structuraldesign of buildings in this Project has been done under his supervision. The formwork and concrete mix design has been done as per lS 10262:2009 or as per other relevant codes as applicable. His periodic chects and certificates for STABILITY and SAFETY have been kept on record. tsl PRESERVATIoN 0F REGoRDS Record of all test results of this Project have been properly kept in the prescribed format and will be preserved at teast up to the Defect Liability Period or for the period as required by any other provision of Law. Please specify deviation in quatity of materials or any other item of work which were not conforming to the specifications as mentioned in Agreement of Sale. Yours faithfully, Nitin M. Zade Consulting Civil Engineer NMC Lic No. 573 Signature of Engineer (Site Supervisor) NIT [-ic No..-:i4+S Name: Nitin M.Zade Qualification (not less than Graduate)- License No (if any): NMC.573,NlT 2445 Mobile No:9822947996 Place: Nagpur Agreed & Accepted by: H 9'/ta.tZZL- Signature of Promoter Name:Krishnagiri Developers Partners Mahesh S.Gulhane Date:31-03-2025