Er. Avinash U keg[RF;DiPloma) "Sugat Nagar , Jariptaka NagBgE -*tQP.+fr"Ulob No.9766399924 ENGINEER'S CERTIFICATE Date: 15/04/2025 To, Goldbricks Infrastructure private Limited Anandam World City, Umred Road, Ganeshpeth, Model Mill Compound, i i Nagpur - 44OOI8 t lt, subject: certificate of cost Incurred. for Development of ,,Kukreja Anandam world city Tower H and M" having MahaRERA Registration number P505000773L4 being developed by Goldbricks Infrastructure private Limited. Sir, I/ we Avinash ukey have undertaken assignment of certifying Estimated cost for "Kukreja Anandam world city Tower H and M,, having MahaRERA Registration number (Not Alrotted) being deveroped by Goldbricks Infrastructure private Limited. we have estimated the cost of civil, MEp and Alried works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifrcations mentioned in agreement of sale' our estimated cost calculations are based on the Drawings/plans made available to us foi the project under reference by the Developer/Consultants. The Schedule of items and quantity for the entire work as calculated by Avinash Ukey (quantity Surveyor) appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3' We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs.1.6g.4z.9g.4ool- (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the Buildings / wing(s) / Layout plotted Developinent from the NMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.25.52.O9.661/- (Total of Table A and B). The amount of Estimated cost Incurred is calculated on the basis of input materials / services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for the I completion of the apartments and proportionate completion of internal & f external works, as per specifrcations mentioned in agreement of sale, of the Project is estimated, at Rs.1.42.95.88.739/- (Total of Table A and B)' 6. I certify that the Cost of the Civil, MEP and Allied work for the apartments and. proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certihcate is as given in Table A and B below: TABLE A "Kukreja Goldbricks Anandam World City Tower H and M" Sr. Particulars Amount (In Rs.f No. I Tot"l Estimated cost of the Building / Wing / 1,67,72,L8,4OO l- Layout / Plotted Development as on date of Registration is 2. Cost incurred as on date of certifrcate 25,52,09,661l- Work done in Percentage L5.22o/o 3. (as Percentage of the estimated cost) 4. Balance Cost to be Incurred r,42,20,08,7391- (Based on estimated Cost) 5. Cost Incurred on Additional fE;xtra Items not Nil included in the estimated Cost (Table C) TABLE B in Respect of the registered rnternal & External Development works Phase ernal and 75,80,000/- External Development Works including amenities and Facilities in the layout as on date of Registration is ffidate of certificate Work done in Percentage I. t (as Percentage of the estimated cost) 75,80,000/- ffiahnce cost to be Incurred (Based on estimated Cost) hr"urt"d ott Additional /Extra Items not includ,ed in the estimated Cost (Table - C) Agreed and AccePted bY: Yours FaithfullY -Aq,gq- -"t Signature of Engineer Pratik Rajesh Sarogi Avinash UkeY Director/ Authorized Signatory Goldbricks Infrastructure Private Limited Date: 15l04l2025