Date: 1510112025 . FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE To, The Goldbricks Infrastructure Pvt. Ltd., Anandam World City, Umrer Road, Model MillCompound, Ganeshpeth Nagpur-44001 8(MH) Subject: Certificate of Percentage of Gompletion of Construction Work of KUKREJA ANANDAM woRLD clrY-TowER H & M having MahaRERA Registration no. P50500077314 being developed by M/s Goldbricks Infrastructuie pvt. Ltd. Nagpur. Sir, _ l, Ar. Sffi€r Rajesh Jaiswal have undertaken assignment as Architect/keneed for certifying Percentage of Completion of Construction Work of KUKREJA ANANDAM woRLD clrY - TowER H & M, having MahaRERA Registration no. P50500077314 being developed by M/s. Goldbricks tnfrastructure pvt. Ltd. Nagpur. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project under MahaREM is as [er table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building KUKREJA ANANDAM WORLD CITY.TOWER H Sr. Tasks /Activity Percentage No. of work done 1 Excavation 100o/o 2 Basements (if anv) 80% 3 Stilt Floor 80% 4 Podium 80o/o 5 Slabs of Super Structure 0% 6 Internal walls, lnternal Plaster, Floorings, Doors and 0% Windows within FlaUPremises 7 Sanitary Fittings within the FlaVPremises 0% 8 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 9 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingAtVing 10 Installation of lifts, water pumps, 0% Equipment as per CFO N mechanical equipment, Compl environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA/r/ing, Compound Wall and all other requirements as may be required to complete proiect as per Page I of3 Table A ANANDAM WORLD CITY.TOWER M Sr. Tasks /Activity Percentage No. of work done 1 Excavation 100% 2 Basements (if anv) 40% 3 Stilt Floor 0% 4 Podium Oolo 5 Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, @ 0% Windows within FlaUPremises 7 Sanitary Fittings withi! the FlaVpremises 0% 8 Staircases, Lifts Wells anO tonU@ 0o/o Overhead and Undel$gUd Water Tanks 9 External plumbing and external @ 0% completion of terraces with waterproofing of the BuildingAffing 10 0% TABLE.B common Areas (lnternal & External Development works) in Respect of the entire Registered phase / project Number S. Common areas Proposed Percentage Details No. and Facilities, Amenities (Yes/No) of Actual Work done (As on date of the certificate) 1 lnternal Roads & Footpaths Yes 0o/o As per plan 2 Water Supply Yes 0o/o Corporation water will be provided 3 Sewerage (chamber, lines, Yes 0o/o As per plan Septic Tank , STP) 4 Storm Water Drains Yes Oo/o As per olan 5 Landscaping & Tree Plantinq Yes 0o/o As per olan 6 Street Liqhtinq Yes 0o/o As per plan 7 Community Buildinqs No 0 NA 8 Treatment and disposal of Yes 0o/o As per plan sewage and sullaoe water Page 2 of3 I Solid Waste management & Yes 0o/o As per plan Disposal 10 Water conservation/ Rain Yes Oo/o As per plan water harvestinq 11. Enerqy manaqement No 0 NA 12. Fire protection and fire safety Yes 0o/o As per plan Requirement 13. Electrical meter room, sub- Yes 0o/o As per plan station, receivinq station 14. Open Parkinq NA 0 NA Yours Faithfully Ar. Rajesh Jaiswal Name of Architect & Signature Reg. no. CN95l 18807, NMC lR-72 Agreed and Accepted by: ;.:.lri i: 'r li,:1,!e.r l'i t 7'F^ I'\i_tU. Mr. Pratik Saraogi ;,;i - t',lf1: Managing Director llt:i" cott, , .l--la.rwr" *.,rttli ,.i;,.i [!erg-d, Nr Goldbricks Infrastructure Pvt. Ltd. (l C ::i i: I l$f l7' Nl : 1i -'1 i,, t'l t1-831 15t01t2025 Page 3 of3