FORM 1 [See Regulatlon S] ARCHITECT'S CERTIFICATE Date: 07 /O7 /2024 To, Goldbricks Infrastru cture private Limited Anandam World City, Umred Road, Ganeshpeth, Model Mill Compound, Nagpur - 44OO18 subject: certificate of percentage of completion of construction work of "Kukreja Anandam World City Tower H and M', having MahaRERA Registration no. (Not Allotted) being developed by Goldbricks Infrastructure Private Limited. Sir, I/ we Architect Raiesh Jaiswal have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of completion of construction Work of "Kukr..eJa Anandam World City Tower H and Mr, having ManaRERA Registration no. (Not Allotted) being developed by Gotdbricks Infrastructure Private Limited. Based on site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certifr that as on the date of this certifrcate, the percentage of Work done for the building of the Real Estate project under Ma_haREM is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A KukreJa Ananda4 World CitY Tower H Percentage of work done Basements (if anY) Podiums (if anY) Slabs of SuPer Structure @rings,Doorsand Windows within Flat/ Premrses srn-it"wpittiog" *ithitt the Flat/Premises OVo St-?-1"a"eq-ffi" Wals and Lobbies at Overhead and Underground Water Tanks t"t"t' elevation' completion of terraces with waterproofing of the g Fittings and o% flttings ' mechanica-i Equipment as per CFO NOC, Electrical of environment /CRZ equipment, Compliance to conditions NOC, Finishing to entrance lobby/s' plinth protectron' Table A Kukreja Anandam Woftd City Tower M Basements (if arry) Podiums (if any) PIinth Slabs of Super Structure Internal walls, Intern@ Windows within Flat/ premises rarura-ry t rttlngs wlrhin the Flat/premises Staircases, f,ifts WeI@ Overhead arrd Underground Water Tanks External plumbing ana extema-l plaster, elevation, completion of terraces with waterproofing of the Building/Wing 11 Installation oI lifts, water p"-@ Equlpment as per CFO NOC, Electrical frttings, mechanical equipment, Compliance to conditions of environmen I /CW NOC, Finishing to entrance lobby/s, plinth protecuon, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE.B of Areas'(Internal & External Development Worksl ln Respect Common ProJect Number the entlre Reglstered Phase / of Detaiis Propos S.No. d6frfron area= and -ercentage ed Actual Work Faclllties, Amenities (Yes/N done ol (As on date of the certifrcate) AS PER ilnt"rnd Ro.as & FootPaths SANCTION]II) PLAN AS PER ilaterconsewation/Rain SANCTIONlti-l water harvesting PLAN AS PER ffinerg management SANCTIONEI) I'LAN ------_ AS 1'1,R Fire Protectlon arro llre sansu SANCTIONEI) PLAN AS PER ffi64 -.t"r room, sub- SANCTIONED station, receiving statlon PI.AN area of r"creation al A-ggregate Open SPace NA eonpwpl.l-/ COITPOILA'I'Ii; N WATER SHALL BE PROVIDED AS PER il"*er"ge(.hamber,lines, SANC'llOi'll:';-' Septic Talk, STP) PLAN i0. Storm Water Drains Yes Oo/o AS PER SANCTIONED PLAN 11. Landscaping & Tree Planting Yes oo AS PER SANCTIONED PLAN 1J. Street Lighting Yes o% AS PER SANCTIONED PI"CN 1.4. Community Buildings No 0 NA 15. Treatment and disposal of No o NA sewage and sullage water 76. Solid Waste management & No 0 NA Disposal Sankalp Creations Rajesh Jalswal Archltect RaioCfi Jaiswal ARCHITECT 587, Cotton Market, Name of Architect & Signature Ghat Road, Nagpur -440 018. cA/95/18807, NMC/R - 72, NIT-632 Pratik Rajesh Saraogi Director/ Authorized Signatory Goldbricks Infrastructure Private Limited Date: 0I /O7 12024