FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 10/04/2026 To, Nareshkumar Sureshrao Devgade, 2175, Hingna Road, Wardh No.2, Mahajanwadi Wanadongri, Nagpur -441110 Subject: Certificate of Percentage of Completion of Construction Work of MAA NARMADA NAGARI-3 having MahaRERA Registration no. P50500076815 being developed by Nareshkumar Sureshrao Devgade. Sir, I/ We Architect Anuraag Vijay Singh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of MAA NARMADA NAGARI-3, having MahaRERA Registration no. P50500076815 being developed by Nareshkumar Sureshrao Devgade. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A MAA NARMADA NAGARI-3 Sr. Tasks /Activity Percentage No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/N Actual Work o) done (As on date of the certificate) 1 Internal Roads & Footpaths Yes 95% AS PER SANCTIONED LAYOUT PLAN 2. Water Supply Yes 85% AS PER SANCTIONED LAYOUT PLAN 3. Sewerage (chamber, lines, Yes 100% AS PER Septic Tank, STP) SANCTIONED LAYOUT PLAN 4. Storm Water Drains Yes 89% AS PER SANCTIONED LAYOUT PLAN 5. Landscaping & Tree Planting Yes 78% AS PER SANCTIONED LAYOUT PLAN 6. Street Lighting Yes 85% AS PER SANCTIONED LAYOUT PLAN 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain No 0 NA water harvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes 81% AS PER station, receiving station SANCTIONED LAYOUT PLAN 14. Aggregate area of recreational Yes 95% AS PER Open Space SANCTIONED LAYOUT PLAN Yours Faithfully Architect Anuraag Vijay Singh Name of Architect & Signature Agreed and Accepted by: Signature of Promoter Nareshkumar Sureshrao Devgade Date:- 10/04/2026