Er. Dhowol Hqrshe B.E (civil) +91 9ts8855005 0 dhowol.horshe@gmoil.com e 0ivine -PROJECTS_ FORM-1 (See Regulation 3) ARCHITECT'S CERTI FICATE For the Period ended on 30th September 2025 Date: 02-04-2025 To PREETI ASHSIH GANJARE M/s Prisha Realities Dhantoli, Nagpur subject: certificate of Percentage of completion of construction work of ,.NARAYANA sPAcEs" having MahaRERA Registration Number p5o5ooo76785 being developed by M/s Prisha Realities (Proprietor: preeti Ashish Ganjarel Sir, Sir, l/we DHAwAt HARSHE have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of completion of construction work of "NARAYANA spACES,, having MahaRERA Registration Number ps05dp76785 being developed by M/s prisha Realities (Proprietor: Preeti Ashish Ganlare). Based on site lnspection, with respect to Layout/each of the BuildingAlving of the aforesaid Real Estate Project, I certifo that as on the date of this certificate, the percentage of work done foreach ofthe buildingArVing ofthe Real Estate project under MahaRERA is as perTable A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Offrce Address Plot No. 9, Flot No. 401, Vinoyok Aportments, Centrol Excise Colony, Opp. Sovorkor Gorden, Chhotropoti Squore, Nogpur - 400015 O www.':EF5tn!l@.com O i9l 9158855115 e divineprojects24@gmoil.com TABLE.A on Plot No Sr. Tosk/Activity Percentoge oI Aduol No Wo* Done (As on dote of the Ceftificote) 7 Excavation 0.00 2 Basements (ifany) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 Stile Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternalwalls, internal Plaster, Floorings, Doors and windows within the flats/Cremises 0.00 8 Sanitary Fittings within within the Flats/premises 0.00 9 Staircases, Lifu Wells and Lobbies at each Floor level, Overhead and Underground Water 0.00 Tanks 10 External plumbing and external palster, elevation, completion of terraces *ith wateftE6fil 0.00 of the Buildin&/Wing 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipmen! compliance to conditions of environmenVCRZ NOg Finishing to entrance lobby,/s, plinth protection, paving of areas appurtenant to Euildin&/Win& Compound wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities TABLE-B Common Areas (lnternal and Extemal Development Works) in Respect of the Retistered phas€/proiect Iumber p505qDG78S 5r. Common oreos ond Focilities Propsed Percentoge Detoils No (Yes/No) of Aduol Work Done (As on dcte of the @rtilicote) (1) (2) (3) (4) (s) 1 lnternal Roads & Footpaths No N.A. 2 Water Supply Yes 700% 3 Sewerage (Chamber, line, Septic Tank, STp) Yes too% 4 Storm Water Drains Yes LOO% 5 Landscaping & Tree Plantang Yes 1000 6 Street Lighting No N,A. 7 Community Buildings No N.A. 8 Treatment and disposal of sewage and sullage water No N.A. 9 Solid Waste management & Disposal No N.A. 10 Water conservation/Rain water harvesting No N.A. 11 Energy management No N.A. t2 Fire protection and fire safety requirements No N.A. 13 Electrical meter room, sub-station, receiving station No N.A. L4 Others (Option to Add more) No N.A. Note: Promoter has received completion certificate from sanctioning Authority on lg-02-2025 Yours Faithfully, Signature & Name AgreeC & Accepted By \\ 'WY Signature of Promoter I{ame: Mrs Preeti Ashish Ganjare Date: