s Divine ;Iffi.15[]i*; FORM.1 (S€e Regulation 3) Er. Dhowol Horshe B.E (civit) +gt 9tsBassoo5 O dhowol.horshe@gmoil.com e ARCHITECT'S CERTI FICATE For the Period ended on 31st March, 202G Date: 02-04-2026 To PREETI ASHSIH GANJARE M/s Prisha Realities Dhantoli, Nagpul subject: certificate of percentage of completion of construction work of ,,NARAYANA sPAcEs" having MahaRERA Registration Number p505fl)076785 being deveroped by M/s Prisha Realities (Proprietor: preeti Ashish Ganlare) Sir, Sir, l/we DHAWAL HARSHE have undertaken assignment as Architect/Licensed surveyor of certifying Percentage of completion of construction work of ,,NARAYANA spACES,, having MahaRERA Registration Number ps05flD76285 being deveroped by M/s prisha Rearities (Proprietor: Preeti Ashish Ganjare). Based on site Inspection, with respect to Layout/each of the Buildin&Affing of the aforesaid Real Estate Project, r certify that as on the date of this certificate, the percentage of work done for each of the buildingfuving of the Real Estate project under MahaREM is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Of fice Address Plot No. 9, Flot No. 401, Vinoyok Aportments, Centrot Excise Cotony, Opp. Sovorkor Gorden, Chhotropoti Squore, Nogpur - 400015 O www. -N:r.:r:E1"Ft1l.com O +gt gtSgASSllS O divineprojects24@gmoil.com TABTE-A on Plot No Sr. Tosks/Adivity Percentoge ol Actuot No Wotk Done (As on dote ol the Certilicote) 1 Excavation 0.00 2 Basements (if any) 0.00 Podiums (if any) 0.00 4 PIinth 0.00 5 Stile Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, internal Plaster, Floorings, Doors and \^,inaor^/i\^ritt in tt e fl.tyF,e.i*, 0.00 8 Sanitary Fittings within within the Flats/premises 0.00 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground W:ter 0.00 Tank 10 External plumbing and external palster, elevation, completion of terraces with waterproofrng 0.00 of the BuildinSi/wing 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildin&/Win& Compound walland all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities f***r.Dtl #fi TABTE-B Common Areas (lntemal and External Development Works) in Respect of the Regirtered phase/project Number p5o5(xrc76785 5r. Common oreas ond Facilities Proposed Percentoge Detoils No (Yes/No) oI Actudl Work Done (As on dob ol the Ceftilhote) (U l2l (3) (4) (s) 7 lnternal Roads & Footpaths No N.A. 2 Water Supply Yes 70004 3 Sewerage (Chamber, line, Septic Tank, STP) Yes 100% 4 Storm Water Drains Yes too% 5 Landscaping & Tree Planting Yes 70004 6 Street Lighting No N.A. 7 Community Buildings No N.A. 8 Treatment and disposalof sewage and sullage water No N.A. 9 Solid waste management & Disposal No N.A. 10 Water conservation/Rain water harvesting No N.A. 1,1, Energy management No N.A. 72 Fire protection and fire safety requirements No N.A. 13 Electrical meter room, suFstation, receiving station No N.A. 74 Others (Option to Add more) No N.A. Note: Promoter has received Completion Certificate from Sanctionint Authority on lg-02-2025 Yours Faithfully, Signature & Name Agreed & Accepted By xvYY Signature of Promoter ,{ame: Mns Preeti Ashlsh Ganjare Date: