Er. Dhowol Horshe s.e (civir) +91 9l5BBS500S @ dhowol.horshe@gmoil.com @ Divine _PROJECTS_ FORM-1 (See Regulation 3) ARCHITECT'S CERTIFICATE For the Period ended on 30st June 2025 Date: 02-04-2025 To PREETI ASHSIH GANJARE M/s Prisha Realities Dhantoli, Nagpur subject: certificate of percentage of completion of construction work of ..NARAYANA sPAcEs" having MahaRERA Registration Number p50500076785 being developed by M/s Prisha Realities (Proprietor: preeti Ashish Ganjare) Sir, Sir, l^ve DHAwAt HARSHE have undertaken assignment as Architect/Licensed surveyor of certifying Percentage of completion of construction work of "I{ARAYANA spACES,, having MahaRERA Registration Number p5o5qto76z85 being developed by M/s prisha Realities (Proprietor: Preeti Ashish Ganjare). Based on Site lnspection, with respect to Layout/each of the Buildin&A,ving of the aforesaid Real Estate Project, I certifo that as on the date of this certificate, the percentage of work done for each ofthe buildin&/wing ofthe Real Estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. (-IIS Offrce Address Plot No. 9, Flot No. 401, Vinoyok Aportments, Centrol Excise Colony, Opp. Sovorkor Gorden, Chhotropoti Squore, Nogpur - 40OOls @ www. GEIIEIiEEIlllE.com @ +919158855115 e divinepro.iects24@gmoit.com TABTE-A on Plot No Sr. losk/Adivity Percentoge ol Aduol No Work Done (As on dote oI the Cenilicote) 1 Excavation 0.00 ') Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stile Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, internal Plaster, Floorings, Doors and \,vindows,"itt in tto ftats/ir".EE 0.00 8 Sanitary Fittings urithin t/yithin the Flats/premises 0.00 staircases, Lifts wetls and Lobbies at each rbor leret, or-.headindG@6iild-Ei6 0.00 Tanks 10 External plumbing and externar parster, erevation, compretion ot tEEces wittr waterpr6iil 0.00 of the Building/Wing 11 lnstallation of Lifu, water pumpt Fire Fighting Fittings and Equipmeni as per CFO NOC, 0.00 Electrical fittings, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildin&/Win& Compound Wall and all other requirements as may be required to complete project as per specifications in agreement ofSale. Any other activities TABtE.B Common Areas (lnternal and External Development Works) in Respect of the Re8istered phasc/project Number p5OS(xfO76785 5t. Common oreds ond Focitities Proposed Percentdge Detoils No (Yes/No) of Actuol Work Oone (As on ddE d the Cettiticate) (U l2l (41 (s) {3} L lnternal Roads & tootpaths No N.A. 2 Water Supply Yes t00yo 3 Sewerage (Chamber, line, Septic Tank, STp) Yes LOO% 4 Storm Water Drains Yes 100% 5 Landscaping & Tree Planting Yes r00% 6 Street Lighting No N.A. 7 Community Buildings No N,A. 8 Treatment and disposal of sewage and sullage water No N.A. 9 Solid Waste management & Disposal No N.A. 10 Water conservation/Rain water harvesting No N.A. 11 Energy management No N.A. t2 Fire protection and fire safety requirements No N.A. 13 Electrical meter room, sub-station, receMng station No N.A. L4 Others (Option to Add more) No N.A. Note: Promoter has received completion certificate from sanctioning Authority on 1g-02-202s Yours Faithfully, "'*w Signature of Promoter t{ame: Mrs Preeti Ashish Ganjare Date: