Er. Dhowol Horshe e.r (civit) ,En +91 glsggsSoos G, dhowol.horshe@gmoil.com e 0ivine ;i[9]IfJi*; FORM-2 (See Regulation 3) ENGINEEPS CERTIFICATE For the period ended on 31't December, 2024 Date: 02-04-2026 To Mrs. PREETI ASHSIH GANJARE PRISHA REALTORS, DHANTOLI, NAGPUR Subject: Certificate of Cost lncurred for Development of "NARAYANA SPACES" having MAHARERA Registration Number "P505m076785" being developed by PRISHA REATTORS (Proprietor Mrs Preeti A. Ganjare) Sir, I DHAWAT HAnSHE, Co6uldlf, E Eineer have undertaken assignment of certifying estimated cost for ""IrlAMYAl{A SPAGS" having MAHARERA Registratbn Number "P505flD76785" being developed by PRISHA REALTORS (Proprietor Mrs Preeti A. Ganjare) 2. We have estimated the cost ClVlL, MEP and other allied works required for completion of the apartments and proportionate completion of internal & external works of the pro.iect as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developers/ Consultants. The schedule of items and quantity required for the entire work as calculated by 01 Quantity Surveyor* appointed by the Developer/ Engineer, and the assumption ofthe cost of material labour and other inputs made by developers, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. Office Address Plot No. 9, Flot No. 401, Vinoyok Aportments, Centrol Excise colony, opp. Sovorkor Gorden, Chhotrqpoti squore, Nogpur - 400015 @ wrYw. EMIEEEEEM.Com O +91 9158855115 e divineProlects24@gmoil.com 3. we estimate Total Estimated cost of completion of the aforesaid project under reference as Rs. 8o,0o,0oo/- (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the civil, MEp and allied works required for completion of the apartments and proportionate completion of internal and external works, as per specification mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the Building (s)flilings (s)/tayout/ plotted Development from the Nagpur Metropolitan Region Development Authority being the planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost lncurred till date is calculated at Rs 36,ar,s50/- (Total of Table A and B). The amount of Estimated cost lncurred is calculated on the basis of input material/services used and unit cost of these items. 5. The Balance cost of completion of the civil, MEp, and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specification mentioned in agreement of sale of the project is estimated at Rs 4c,Ilo,lfil- (Total of Table A and B). 5. certifi/ thatthe cost of civil, MEp and allied workforthe apartments proportionate internal and external works, as per specification mentioned in agreement of sale of the aforesaid Project as completed on the date of his certificate is as given in Table A & B below: rfuu[ffii t t. l,s$t500574' S").;9 TABLE-A No N.A. Sr. Particqlars Amount (ln Rs.) No 1 Iotal Estimated cost ofthe project as on date of Registration 2 Cost lncurred as on date of certificate 3 Work done i! percentages (as Percentage ofthe Estimated Cost) 4 Balance Cost to be lncurred (based on the Estimated Cost) Cost lncurred on Additional /Extra ltems not included in the estimated cost (Table C) TABtE.B Internal & Ertemal Development Works in Respect of the Registered phase Sr. Particulars Amount (ln Rs.) No 7 Total Estimated cost of the lnternal & External Development Works including amenities and Facilities in the layout as on date of Registration is 80,00,000.00 2 Cost lncurred as on 31-12-2024 35,89,550.00 Work done in Percentage (as percentage of the estimated cost) 46.720/" 4 Balance Cost to be lncurred (Based on the Estimated Cost) 43,10,450.00 5 Cost lncurred on Additional/ Extra ltems not included in the Estimated Cost (Table C) 0.00 TABTE-C Ust of Extra/Additional/Deleted ltems considered in Cost were not part of the Estimate of Total Ust ol Ertm /Additioo nt/Deleted tte ms ffi Yours Faithfully, Signature of Engineer Agreed and Accepted by: Signature of Promoter Name: MIs Preeti Ashish Ganiare Date: