Er. Dhqwol Hqrshe a.e (civit) FN +91 9l588s5oo5 O dhowol.horshe@gmoil.com @ Divine PROJECTS FORM-1 - - (See Regulation 3) ARCHITECT,S CERTIFICATE For the Period ended on 31't March 2025 Date: 02-04-2026 To PREETI ASHSIH GANJARE M/s Prisha Realities Dhantoli, Nagpur Subject: Certificate of Percentage of Completion of Construction Work of "NARAYANA SPACES" having MahaRERA Registration Number P50500076785 being developed by M/s Prisha Realities (Proprietor: Preeti Ashish Ganiare) Sir, Sir, l/We DHAWAL HARSHE have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of "NAMYANA SPACES" having MahaRERA Registration Number P50500076785 being developed by M/s Prisha Realities (Proprietor: Preeti Ashish Ganjare), Based on Site lnspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingf ing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the the entire phase is detailed in Table B. liF le Ad:l ress Plot No. 9, Flot No.40l, Vinoyok Aportments, centrol Excise colony, Opp. Sovorkor Gorden, Chhotropoti Squore, Nogpur - 400015 C www. Etolft=.r:t'llln.com O +91 9158855115 O divineprojects24@gmoil.com TABTE-A on Plot No Sr. rosk/Activity Percentoge ol Actuol No Wo* Done (As on dote oI the Cettificdte) 1 Excavation 0.00 2 Basements (if any) 0.00 Podiums (if any) 0.00 4 Plinth 0.00 5 Stile Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, internal Plaster, Floorings, Doors and windows within the Flats/Premises 0.00 8 Sanitary Fittings within within the Flats/Premises 0.00 9 Staircases, Lifts Wells and Lobbi6 at each Floor level, Overhead and Undeground Water 0_00 Tanks 10 External plumbing and external palster, elevation, completion of terraces with waterproofing 0.00 ofthe BuildingA^/ing 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0.00 Electrical fittiogs, mechanical equipmen! compliance to conditions of environmenvcRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building,/Win& Compound Wall and all other requirements as may be required to complete proiect as per specifications in agreement of Sale. Any other activities nI TABLE.B Common Ar€as (lntemal and Extemal Deyelopment Works) in Respect of the Registered Phas€/Proiect Numb€r P505(m76785 Sr. common oteos and Focilities Proposed Percentage Detdils No (Yes/No) ol Aduol Work Done (As on dote ol the Certilicdte) (1) (21 (3) (4) (s) 1 lnternal Roads & Footpaths No N.A. 2 Water supply Yes too% 3 Sewerage (Chamber, line, Septic Tank, STP) Yes 100% 4 Storm Water Drains Yes ro0% 5 Landscaping & Tree Planting Yes 100% 6 Street Lighting No N.A. 7 Community Euildings No N.A. 8 Treatment and disposal of sewage and sullage water No N.A. 9 Solid Waste management & Disposal No N.A. 10 Water conservation/Rain water harvesting No N.A. 11 Energy management No N.A. L2 Fire protection and fire safety requirements No N.A. 13 Electrical meter room, sub-station, receiving station No N.A. t4 Others (Option to Add more) No N.A. Note: Promoter has received Certificate from Sanctioning Authority on 1842-2025 Yours Faithfully, Agreed & Accepted By MIY Signature of Promoter ame: Mrs Preeti Ashish Ganjare Date: