Annexure A Form 1 [see Regulation 3] ARCHITECT’S CERTIFICATE (To be Submitted at the time of Registration of Ongoing Project & For Withdrawal of Money from Designated Account) For the Quarter January to March 2025 Date: 12/04/2025 To, M/S NIRMAL UJJWAL CREDIT CO-OPERATIVE SOCIETY LTD 193, Nandanvan Main Road, Nagpur - 440009 Subject: Certificate of Percentage of Completion of Construction Work of “Nirmal Trinity Towers” having MahaRERA Project Registration No. P50500076597, situated on Kh.No.19, Mouza-Harpur, C.T.S No.649/3, Sheet No-31, situated at Nirmal Nagri, Umred Road, Ward No.-20, Tehsil & District – Nagpur being develop by M/S NIRMAL UJJWAL CREDIT CO-OPERATIVE SOCIETY LTD. Sir, I Harish Chandnani have undertaken assignment as Architect of certifying Percentage of Completion of Construction work of Nirmal Trinity Towers having MahaRERA Registration Number P50500076597 being develop by M/S NIRMAL UJJWAL CREDIT CO-OPERATIVE SOCIETY LTD. Based on Site Inspection, with respect to Each of the Building /Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage Work done for Each of the Building /Wing of the aforesaid Real Estate Project out of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing (to be prepared separately for each Building/Wing of the project). Percentage of Actual Sr.no. Task/Activity the work done (as on date of the certificate) 1. Excavation 3.59% 2. Plinth Nil 3. Podiums Nil 4. Stilt Floor Nil 5. Slabs of Super structure Nil 6. Internal walls, Internal Plaster, Floorings within Nil Flats, Doors and windows to each of the flat 7. Sanitary Fittings within the flat Electrical fittings Nil within the flat 8. Staircase, lifts well and Lobbies at each floor level Nil connecting staircases and lifts, overhead and underground water tank 9. The External plumbing and external Plaster Nil elevation, Completion of terraces with waterproofing of building 10. Installation of lifts, water pumps, fire fighting Nil fittings and equipment as per CFO NOC, Electrical Fittings to common areas, Electro Mechanical Equipment, Compliance to conditions of environment/ CRZ NOC, finishing to entrance lobbies, Plinth protection, paving of areas appurtenant to building, Compound wall and all other requirement as may be required to obtain occupation/ Completion Certificate TABLE-B Common Area (Internal & External Development Works) in Respect of the entire Registered Phase/Project Phase Percentage of Sr. no. Common Area & Facilities, Propos actual work done Details Amenities ed (As on date of (Yes/N Certificate) o) 1. Internal Roads & Footpaths No 0% - 2. Water Supply No 0% - 3 Sewerage (Chambers, lines, 0% - Septic Tank, STP) No