Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 15/07/2025 To, KUKREJA INFRASTRUCTURES NAGPUR, MAHARASHTRA, 440014 Subject : Certificate of percentage of Work of completion of construction work of KUKREJA EMBASSY-II having MahaRERA Registration Number P50500076706 (Only Applicable after project Registartion) being developed by KUKREJA INFRASTRUCTURES Sir, I/We AR LOKESH KADU have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of KUKREJA EMBASSY-II having MahaRERA Registration Number P50500076706 (Only Applicable after project Registration, being developed by KUKREJA INFRASTRUCTURES ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: KUKREJA EMBASSY-II/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 100.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 84.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 34.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 51.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 14.00 NMC WATER SHALL BE PROVIDED 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 26.00 AS PER SANCTIONED PLAN 4 Storm Water Drains Yes 0.00 AS PER SANCTIONED PLAN 5 Landscaping & Tree Planting Yes 0.00 AS PER SANCTIONED PLAN 6 Street Lighting No 0.00 NA 7 Community Buildings Yes 0.00 CLUB SHALL BE PROVIDED AT FIRST FLOOR 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA 9 Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 0.00 AS PER SANCTIONED PLAN 11 Energy managemcnt Yes 0.00 AS PER SANCTIONED PLAN 12 Fire protection and fire safety requirements Yes 0.00 AS PER SANCTIONED PLAN 13 Electrical meter room, sub-station, receiving station Yes 8.00 METER PANNEL SHALL BE PROVIDED 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully AR LOKESH KADU Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2007/39381) Date of Certificate: 15/07/2025 Agreed and accepted by: Signature of Promoter Name: KUKREJA INFRASTRUCTURES Date: 15/07/2025 Page 3 of