Anisha Apartment, Flat No.101, VIVEK N. RAUT Pandey Layout, Khamla,NagPur'25 I Ancnrecrs, ENctrueens Ph: 9823037838, 77220007 61 N.l.T. Lc.No.l050 E-mail : vivek.raut101@gmai!.com Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) q^ AP^t fo June-2096 Date: | 9,oT LqU To, RAMESH PANDURANG BAGDE Nagpur, IIiAHARASHTRA,44O0 1 5 Subiect: Certificate of Cost lncurred for Development of BANK COLONY having MahaRERA Registration Number P50500076632 (Only Applitable after project Regrstartion) being developed by RAMESH pANDURANG BAGDE Sir, l lAffe Vivek Raut have of Certifying Estimated Cost for BANK COLONY having MahaRERA Registration Number P50500076632 (Only Applicable after project Registration, being developed by RAMESH PANDURANG BAGOE ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & external works of the project as per specifications mentioned in agreements of sale' Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer i Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / conflrm the above analysis given to us. 3' We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 37274000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Ci\iil, MEP and Allied works required for completion oflThe apartments and proportionate completion of internal & external works,as per specifications mentioned in agrdEments of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) ArVing(s)/ Layout /Plotted Development from the NMRDA Nagpur being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4'The Estimated Cost incured till date is calculated at Rs. 18574000.00 (Totat of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5' The Bllance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 18700000.00 (Total of Table A and B) i--- a -a A 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :/ Sr. No. Partjeulars fKffiffilli;h(ii{i 1 Total Estimated Cost of the 18637000.00 2 9287000.0c Cost incurred as on date of certificate 3 Work done in Percentaoe (as Percentaqe of the estimated cost) 49.83 4 Cost to be lncurred**(Based on EstimateilCost 9350000.00 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C fable B lnternal and External Development Works in of the Reglstered Phase Total Estimated Cost of the cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfuily Tt-ryt;/ rT. VNrEK N. RAUT NIT Llc. No. 1O50 Anlsha APt., Pande layout, NagPur' vrvEK RAUT signature & Name (lN BLocK LETTERS)with stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. 1050 (if appticable) Date of Certificate: Agreed and Accepted by: Signature of Promoter Name: RAMESH PANDURANG BAGDE Date: lS^ 07 - po26 1'The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2'(.) Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of person the in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3'('*) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incuned / to be incuned. 4'All components of work with specifications are indicative and not exhaustive S'Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale.