FORM-2 (See Regutation 3) ENGIN RER'S CERTIFICATE For the Period Ended on 3oth June, 2026 Date: LalOAl2026 To Mr. Sanjeev Ashok Jaiswal Nagpur Subject: Certificate of Cost Incurred for Development of A SINGAPORE LIFE CITY THE uroPrA 4, at Plot No. 2D, singapore Life city , Kh.No. L7, Mouza-Gotad panjiri, Nagpur'44L 1O8, having MAHARERA Registration Number P5OSOOO66460 being developed by Shri Sanjeev Jaiswa! Sir, Sir, I Ashlesh Naik, Consulting Engineer have undertaken assignment of certifying estimated cost for A SINGAPORE LIFE CITY THE UTOPIA 4 having MahaRERA Registration Number P5O5OOO6646(J being developed by Shri Sanjeev Jaiswal 2. We have estimated the cost CIVIL, MEP and other allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developers/ Consultants. The schedule of items and quantity required for the entire work as calculated by 02 Quantity Surveyorx appointed by the Developer/ Engineer, and the assumption of the cost of material labour and other inputs made by developers, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 13,32,OO,OOOl- (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEp and allied works required for completion of the apartments and proportionate completion of internal and external works, as per specification mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the Building (s)/Wings (s)/Layout/ Plotted Development from the Nagpur Metropolitan Region Development Authority being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date i.e. 30lOOl2026 is calculated at Rs 4,67,26,991.20- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input material/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP, and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specification mentioned in agreement of sale of the Project is estimated at Rs 8,64,73,008.80/- (Total of Table A and B). 6. Certify that the cost of Civil, MEP and allied work for the apartments proportionate internal and external works, as per specification mentioned in agreement of sale of the aforesaid Project as completed on the date of his certificate is as given in Table A & B belowr TABtE.A 'otal Estimated cost of the as on date of Registration t lncurred as on 30-06-2026 4,67,26,997.20 ork done in percent (as Percentage of the Estimated Cost nce Cost to be lncurred (based on the EstimatEf6l Cost lncurred on Additiona TABTE-B lnternal & Externar Development works in Respect of the Registered phase TotalEstimatedcostofthelnternal&rxternalDev"to Facilities in the layout as on date of Registration is lncurred as on date of certificate Work done in Percent of the estimated cost) Balance Cost to be lncurred on the Estimated Cost Cost lncurred on Additional / TABLE-C List of Extra/Additional/Deleted ttems considered in Cost hich were not part of the Estimate of Total c, t Sr. Li st oI Extro /Ad d itioo n t/ De lete d I te m s Amount (ln Rs.) No 1, 2 (fshlesh Naik) Licence Number N.A.